OPERATION
Typhoon
1610P/1612 (04–99)
7
MACHINE INSTALLATION
Check carton for signs of damage. Report damages
to carrier immediately.
Check machine contents list, contact distributor for
missing items.
MACHINE CONTENTS
1 – 3 m (10 ft) vacuum hose – For accessory tools
1 – Cloth bag
1 – Paper bag
1 – 15 m (50 ft) power cord
NOTE: Squeegee and Accessory Tool Kits are sold
separately. See Optional Accessories.
ATTACHING HANDLE
1.
Remove handle from ship position. Also remove
upper handle mounting screws and washers from
machine (
Figure 1).
Handle
(4) Screws
w/Washers
Cord Grip
Exhaust Hose
FIG. 1
2.
Realign handle as shown and replace screws and
washers.
3.
Push excess cord slack up into cord grip. Tighten
cord grip with 5/16 inch wrench until cord is
secure. DO NOT overtighten.
4.
Connect exhaust hose to bottom of handle
housing.
ATTACHING OPTIONAL SQUEEGEE KIT
See Optional Accessories.
1.
Empty recovery tank.
2.
Remove vacuum bag.
3.
Tip machine on back.
4.
Remove (2) bolts and washers located at bottom
of machine.
5.
Install squeegee mounting bracket with bolts and
washers (
Figure 2).
FIG. 2
6.
Fasten squeegee to mounting bracket. Use (2)
clevis and cotter pins provided (
Figure 3).
FIG. 3
7.
Stand vacuum upright.
8.
Insert spacer through hole in pedal as shown.
Position pedal between two holes in bracket and
slide hex head screw through bracket and pedal.
Secure with washer and nut
(Figure 4).
FIG. 4