OPERATION
6
BR--2250/BR--2500 (11--01)
MACHINE COMPONENTS
5
6
7
9
8
4
10
2
3
1
18
17
11
12
13
14
15
16
1. Control Console
2. Dust Control Hose
3. Dust Bag Access Door
4. Dust Control Skirt
5. Battery Cover
6. Frame
7. Wall Rollers
8. Pad Driver
9. Main Wheels
10. Circuit Breakers
11. Pad Pressure Meter
12. Key ON Light
13. Travel Speed Selection Switch
14. Key Switch
15. Fuse Holder
16. Control Grips
17. Battery Level Meter
18. Carbon Brush Indicator Lamp
CONTROL PANEL SYMBOLS
Main Power
Read Manual
Before Operating
Battery
Charge Meter
Fast
Speed
Slow
Speed
Pad
Содержание BR 2250
Страница 18: ...OPERATION 18 BR 2250 BR 2500 05 07 ...