No-Mar Cycle Hill HD Скачать руководство пользователя страница 3

Machine Parts

Assembly Parts 

5/16" 

  

x 5/16" set screw (

installed

1/2"

 

x 1" 

 H

ex bolt (3) 

1/2" 

Flat 

Washer (

3

5/16" x 

1/2

" Flat Socket Head Screw (

16

5/16"

 

x 3/4" Shoulder Bolt (

2

1/4"  Nylock Nut (

2

5/16" x 1 /2" Flat Socket Head Screw (12)

 

Gl) 

3/16" Allen Wrench (

1 - 

in stand box) 

<B 

5/32" Allen Wrench (

1 - 

with M/D Handle)

 

Changer Placement: 

We recommended assembling the tire changer before mounting to the floor so the user will better understand the space needed for the changer 

and changer tools. We recommend providing a 5-foot clearance circle from the center of the frame assembly, and 12” clearance from the rear of the machine to any 

wall.

  See Figure B.

STEP 1 

Attach Bead Breaker Platen (G) to the top of Stand Base (B) using 2 Screws (W). The side with chamfered (counter-sunk) holes is the bottom of the Stand Base (B).

 

STEP 

2

 Attach Stand Base (B) and Stand Triangle Top (C) to Stand Post (A) 

u

sing 16 Screws (S). There are 8 screws for each plate, but only 4 of each are shown on the 

diagram due to a design revision. 

The notch in the Stand Triangle goes towards the front.  

The bead breaker tab on the stand post should 

face the front as well

.

  Make 

sure all threads of all screws are started before tightening and be certain to tighten these screws securely.

STEP 

3

 Attach 3 frame arms (D) using 2 "Y-plates"

 

(E) 

as shown

, fastening with 6 screws (Z) on top and bottom. 

Make sure all threads of all screws are started before 

tightening. 

STEP 

4

 Attach Frame Assembly (D) to the Stand Assembly in the orientation pictured, using 3 1/2" hex bolts (Q) and 

3

 

washers (R). 

Use a 3/4" (19mm) wrench to tighten.

 

STEP 

5

 

Attach Bead Breaker Arm (H) to the 

top hole in the tab on the 

Stand Post (A) using a

 3/4" shoulder bolt (V)

 and 

a Nylock Nut (X)

(There will be play in this joint -- 

this is by design!!!) 

STEP 

6

 Attach Bead Breaker "Tee" (I) to the Bead Breaker Arm (H) using the 

other 3/4"

 shoulder bolt (

V

) and Nylock nut (X). Verify proper alignment of the tee so that 

t

he 

curve of the tee aligns with the curve on a wheel

.

 Use 5/32" Allen Wrench and 7/16" wrench on Nylock nut to tighten.  (There will be play in this joint -- this is by 

design!!!) 

STEP 7

 Compare your assembled changer to the photo in Figure C to verify everything was done correctly.

STEP 

8

 

Mount the tire changer to a suitable floor using anchors.

STEP 9

 

Before fully

 clamping your wheels in the Posi-Clamps

,

 with the bearing centered over the cup in the frame assembly, place the Center Post (

J, K, or L

) with the 

best fit through the bearing of the wheel down into the cup in the frame assembly.  

Then tighten the Posi-Clamps securely. 

You are now ready to start changing tires!

STEP 1

0

 

Please visit the Video Library on our website to familiarize yourself with tire changer use and technique prior to changing your first tire.

Parts, labels, names, drawings, 

sizes, 

pricing and availability are subject to change without notice. Contact us or see our website if you have any questions.

REV. 

3

/20

20

CA

Cycle Hill

® HD 

 

Assembly Diagram & Instructions

Figure 

A

 - 

Exploded Diagram

L

K

J

Stand Post

Stand Bottom Plate Stand 

Triangle Top Plate

 

Frame 

Assembly

Y-Plate with Cup

Posi-Clamps

Bead  Breaker  Platen Block

 

Bead Breaker Arm

ATV Bead Breaker "Tee"

Large

 

Center Post

*

Medium Center Post

Small Center Post

(*Large Center Post also serves as the bead 

breaking lever when inserted in Bead Breaker 

Arm 'H'.  

Never

 use the Mount/Demount bar 

as a bead breaking lever!)

A

B

C

D

E
F

G
H

I

J

K

L

E

Отзывы: