background image

Tools required:

Drill/Screwdriver

Mallet

Hack saw

1

2

3

13

12

15

18

4

6

14

16

15

11

8

10

3

5

7

9

17

EXPLODED VIEW

Tools included:

Spanner

Torx bit

ITEM 

NO.

PART NAME

DRG NUMBER

LENGTH

Default/QT

Y.

1

S1 Frame

S1

Default

5

2

CB1 Bracket

CB1

Default

6

3

JF1 Bracket

JF1

Default

6

4

S1 Stub

S1

Default

2

5

JF2 Bracket

JF2

Default

4

6

RB1 Bracket

RB1

Default

8

7

R4 Rafter

R4

Default

4

8

ST9 Roof Tie

ST9

Default

2

9

JF3 Bracket

JF3

Default

2

10

P4 Post

P4

Default

1

11

L1 Bracket

L1

Default

6

12

FT1 Bracket

FT1

Default

3

13

FT3 Bracket

FT3

Default

4

14 Sealing Strip -  2195mm

Sealing Strip

Default

6

15

ACE2 Roof Panel

Default

2

16

ACC2 Roof Panel

Default

1

17

RC2 Roof Strip

Default

4

18

A2 Angle

A2

Default

3

19

40x40 End cap

BOUGHT IN ITEM

40 x 40 x 20

11

Содержание SR1587

Страница 1: ...Assembly Instructions Shelter type SR1587 SR1587 05 210219 USA...

Страница 2: ...Tools required Drill Screwdriver Mallet Hack saw 1 2 3 13 12 15 18 4 6 14 16 15 11 8 10 3 5 7 9 17 EXPLODED VIEW Tools included Spanner Torx bit...

Страница 3: ...x 40 8 66 x 1 57 2 10 P4 POST 1995 x 40 x 40 78 54 x 1 57 x 1 57 1 11 L1 BRACKET 95 x 45 x40 3 74 x 1 77 6 12 FT1 FOOT BRACKET 109 x 100 x 40 4 29 x 3 93 x x1 57 3 13 FT3 FOOT BRACKET 109 x 100x 80 4...

Страница 4: ...LUE MM MEASUREMENTS IN GREEN INCHES S1 CB1 JF1 CB1 CB1 Ensure correct alignment on corners DETAIL A SCALE 1 5 JF1 JF2 CB1 S1 STUB Step 1 Assemble S1 frames to make up the main structure using CB1 brac...

Страница 5: ...R4 RB1 RB1 R4 Step 2 Attach first R4 rafters using RB1 brackets on the back of the shelter and S1 stubs in the middle 5...

Страница 6: ...T9 P4 DETAIL C SCALE 1 4 JF3 JF3 RB1 RB1 Step 3 Assemble the T frame using two ST9 tie bars and a P4 post Join the two ST9 bars together first using JF3 brackets then attach the P4 post using two RB2...

Страница 7: ...ach the T bar to the front of the shelter and install the remaining R4 rafters using RB1 brackets on the rear and L1 brackets at the front Attach the FT1 and FT3 brackets and move the shelter in to it...

Страница 8: ...ACE2 ACE2 ACC2 SS ACE2 ACE2 ACE2 SS Step 5 Stick sealing strips SS to the rafters and align the ACE2 panels to the outside of the shelter and centralise the ACC2 panel in the centre 8...

Страница 9: ...to the rafter with the 25mm TEC screws to secure the roof panels Then fit the Black plastic caps on exposed nuts and bolts Fit the square end caps EC40 to any open ends of box sections Screw the A2 Ro...

Страница 10: ...Notes 10...

Страница 11: ...0 3228 TO FOOT HOLE CENTERS 127 087 41 122 40 748 40 748 3145 123 819 39 173 41 122 85 919 2183 14 11 PLAN VIEW OVERALL DIMENSIONS AND GROUND FIXING POSITIONS Suggested size for concrete base 200mm 7...

Страница 12: ...06443 MAINTENANCE To ensure your product gives you many years of use we recommend that you THANK YOU FOR PURCHASING THIS PRODUCT Clean panels regularly with soapy water Ensure all fittings are tight f...

Отзывы: