background image

14

6

1

2

12

13

8

3

4

10

11

5

7

9

17

16

15

18

2

EXPLODED VIEW

Fittings Bolt set M10

Nut Washer Black

Cap

T25

AB1210

M10 x 60mm

25mm 

Tech 

screw

M10 X 100mmC2  

Concrete Bolt

Pack C+D

40

40

80

80

202

13

Required

38

38

76

76

90

7

Spare

2

2

4

4

112

6

Image

ITEM 

NO.

PART NAME

DRG NUMBER

LENGTH Default/QT

Y.

1

S1 Frame

S1

Default

4

2

S3 Frame

S3

Default

2

3

CB1 Bracket

CB1

Default

4

4

JF1 Bracket

JF1

Default

6

5

RB1 Bracket

RB1

Default

10

6

Rafter

R3

Default

5

7

L3 Bracket

L3

Default

2

8

B4 Beam

B4

Default

2

9

P4 Post

P4

Default

1

10

JF3 Bracket

JF3

Default

1

11

L1 Bracket

L1

Default

8

12

FT1 Bracket

FT1

Default

3

13

FT3 Bracket

FT3

Default

5

14

Sealing Strip

SS

Default

8

15

ACE3 Roof Panel

ACE3

Default

2

16

ACC3 Roof Panel

ACC3

Default

2

17

RC3 Roof Strip

RC3

Default

5

18

A2 Angle

A2

Default

4

19

40x40 End cap

BOUGHT IN ITEM

40 x 40 x 

20

9

Содержание SR1585

Страница 1: ...Assembly Instructions Shelter Type SR1585 SR1585 02 210219 USA Email Sales nobutts com Web www nobutts com Tel 1 888 662 8887...

Страница 2: ...1 5 7 9 17 16 15 18 2 EXPLODED VIEW Fittings Bolt set M10 Nut Washer Black Cap T25 AB1210 M10 x 60mm 25mm Tech screw M10 X 100mmC2 Concrete Bolt Pack C D 40 40 80 80 202 13 Required 38 38 76 76 90 7 S...

Страница 3: ...BRACKET 73x38 2 87x1 50 2 8 B4 BEAM 2080x40x40 81 89x1 57x1 57 2 9 P4 POST 1995x40x40 78 54x1 57x1 57 1 10 JF3 BRACKET 220x40 8 66x1 57 1 11 L1 BRACKET 95x45 3 74x1 77 8 12 FT1 BRACKET 109x100x40 4 2...

Страница 4: ...alignment CB1 JF1 S3 S1 Make sure corners are correctly aligned CB1 CB1 Step 1 Assemble S1 and S3 frames to make up the main structure using CB1 brackets for the corners and JF1 brackets for the stra...

Страница 5: ...A RB1 R3 L3 R3 RB1 L3 DETAIL A SCALE 1 4 L3 R3 Step 2 Attach the R3 end rafters using L3 brackets at the front and RB1 brackets for the rear 5...

Страница 6: ...B T section DETAIL B SCALE 1 3 RB1 JF3 B4 P3 EC40 JF3 B4 P4 RB1 Step 3 Assemble the T section by attaching the B4 ties to the P4 post using RB1 and JF3 brackets 6...

Страница 7: ...C L1 DETAIL C SCALE 1 6 L1 Step 4 Attach T section using L1 brackets...

Страница 8: ...T3 FT1 FT3 FT1 Step 5 Move the shelter to its final position and make sure it is square and level Then attach the FT1 and FT3 foot brackets and use anchor bolts to secure the structure to the ground 8...

Страница 9: ...SS Step 6 Apply Sealing strips SS to the rafters 9...

Страница 10: ...ACC3 ACE3 RC3 A2 A2 RC3 ACE3 ACC3 Step 7 Place ACE3 and ACC3 with small gaps between each Use RC3 strips and screws to secure panels Finally attach A2 to the rear of the shelter 10...

Страница 11: ...35 1035 1044 50 2070 50 2069 50 4180 18 78 167 36 41 12 40 75 40 75 40 75 81 48 81 52 164 57 20 73 42 62 1082 57 11 PLAN VIEW OVERALL DIMENSIONS AND GROUND FIXING POSITIONS Suggested size for concrete...

Страница 12: ...6443 MAINTENANCE To ensure your product gives you many years of use we recommend that you THANK YOU FOR PURCHASING THIS PRODUCT Clean panels regularly with soapy water Ensure all fittings are tight fo...

Отзывы:

Похожие инструкции для SR1585