n ne ste
125
e
e an al
Pressure Regulator Removal/Installation (Continues)
9. Disconnect the electrical connections (D) and (F).
10. Remove the fastening screws (G) of the pressure regulator assembly with valves (H).
11. Remove the pressure regulator assembly with valves (H).
12.
$WWKHZRUNEHQFKUHPRYHWKHÀWWLQJ,IURPWKHÀWWLQJ-
13.
8QVFUHZWKHÀWWLQJ-IURPWKHSUHVVXUHUHJXODWRU.
14.
,IQHFHVVDU\XQVFUHZWKHÀWWLQJV/DQG0IURPWKHSUHVVXUHUHJXODWRU.
15. Retrieve the pressure regulator (K).
Assembly
16. Assemble the components in the reverse order of disassembly.
17. Perform the LPG System Leakage Check (see the procedure in LPG System Leakage Check paragraph).
18.
,IDQHZSUHVVXUHUHJXODWRUKDVEHHQLQVWDOOHGDGMXVWWKH&2VHHWKHSURFHGXUHLQ´&2
2
Adjustment”).
J
G
H
J
D
F
K
I
L
M
P200231
Содержание SW4000
Страница 24: ...ene al nfo at on 24 e e an al Dimensions 1330 mm 52 4 in 1065 mm 42 in 1640 mm 64 6 in P200092 ...
Страница 233: ......