-
A 10
・
-
VBA18001-R.3719.A
logo�Q0440�forGraphic
070518�Gdesign�ito
A
A
・
Mount the AF sensor base plate (#B10297).
・
Tighten one screw (#303) and three screws (#1526).
・
Attach the spring (#304).
・
Put two springs (#296) and one spring (#293) to surround each post.
・
Mount the AF sensor unit (#B3004).
・
Put two washers (#300).
・
Turn two screws (#295) lightly all the way to the end, then give them three turns counterclockwise.
・
Put the washer (#294).
・
Put the E ring (#298).
・
Attach the plate (#283).
・
Tighten the screw (#1588).
・
Connect the
TTL FPC
to the connector.
・
Attach the plate (#282).
・
Tighten the screw (#1588).
・
Attach the mold (#281).
・
Tighten the screw (#1532).
AF sensor unit
#1532
#281
#303
#1526×3
#296×2
#304
#298
#294
#293
#B3004
#300×2
#295×2
#282
#284
#283
#1588×2
#B10297
#304 spring
hooking position
#303
TTL FPC
△
(Revision) Front body FPC
△
(Revision) Front body FPC
M
サービス
計画課
Dec.28.2007
Changed page
△× 2
INC
Содержание D3 VBA18001
Страница 134: ...INC ...