
Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person.
Date
Signature
Notes
Description
✔
Hot water (page 25)
Shut off valves
Mixing valve
Cold water (page 25)
Shut off valves
Non-return valve
Safety valve
Electricity (page 26)
Connected supply
Sensors
Temperature limiter
VPAS 300/450 | GB
18