Nibe VEDEX 4000 Скачать руководство пользователя страница 22

22

VEDEX 4000

7 Pipe installation

Draining

Cooling coil

Environmentally friendly 

approved

Filling

Flue gas thermometer

Connection

The pipe installation must be carried out in accord-

ance with current norms. Internal support bushes 

should be fitted when a steel pipe or annealed copper 

pipe is used.

The overflow pipe from any of the safety valves must 

be routed to a floor drain to prevent hot water splash

-

es when checking the valves or when bleeding the 

boiler. The outlet of the overflow pipe must be visible.

If the heating installation has an open expansion 

tank, the distance between the highest radiator and 

the expansion tank must not be less than 2.5 m.

Fill the boiler with water using a fixed filler line to one 

of the expansion connections or a hose in the drain-

ing valve.

The draining valve is installed next to connection. 

Drain by connecting a hose to the draining valve.

To meet the environmentally approved requirements 

during  wood  firing  an  accumulator  tank  of  at  least 

1500 litres must be installed with the boiler.

VEDEX 4000 is supplied with cooling coil for connec-

tion to a temperature limiting valve. Refer to the man-

ufacturer’s instructions when installing.

VEDEX 4000 is supplied with an enclosed flue gas 

thermometer which must be installed in the flue gas 

door outlet. The sensor is connected to the control 

module, while the sensor is placed in the boilers 

chimney flue with the pressure screw in the sleeve.

Min 2,5 m

The  pipe  work  must  be  flushed  before  the 

boiler is connected, so that any contaminants 

do not damage the component parts.

NOTE

If filling via the radiator circuit, the shunt valve 

must be in a central position. Otherwise there 

is a risk of cracking one of the radiators.

NOTE

In the case of a closed circuit, you must add 

a boiler protection system (such as the safety 

coil) to prevent overheating. In an open cir-

cuit this is recommended.

NOTE

Содержание VEDEX 4000

Страница 1: ...21 01 2019 30 09 2019 27963 INSTALLATION AND MAINTANCE MANUAL Wood gasifying boiler VEDEX 4000...

Страница 2: ...rience and knowledge about the appliance unless they have been given supervision or instruction concerning the use of the appliance by a person responsible for their safety Children should be supervis...

Страница 3: ...ance to walls_______________________ 19 Turbulators____________________________ 20 Installing ceramics______________________ 20 Pre installed ceramic kit__________________ 20 Ceramic grate____________...

Страница 4: ...r is designed for houses with water borne heating and is environmentally approved for accumulator tank firing The VEDEX 4000 must be installed by approved and competent personnel in accordance with th...

Страница 5: ...accumu lators to the radiator circuit via a shunt valve SV1 where the desired temperature to the radiators is maintained by mixing the hot accumulator water with the cooled return water from the radi...

Страница 6: ...5 Turning the boiler on off Touching will open the menu for turning the boiler on off and oper ating mode for heating and domestic hot water 6 Burner shows current status for burner oper ation Touchi...

Страница 7: ...ause Blower in burning off Incandescing time min Burning off time min Lambda control Oxygen power 100 Exhaust fan Min exhaust gas temperature C Nominal exhaust gas temperature C Max exhaust gas temper...

Страница 8: ...Boiler pump Cascade Master EGT sensor type Energy measure Blower with HALL Out test Hot water pump Boiler pump Solar pump Exchanger cleaner Blower ExhaustF CH1 pump CH2 pump CH3 pump CH4 pump CH1 mix...

Страница 9: ...essing the SETTINGS button we move to boiler settings In order to change boiler opera tion programme return to the main menu and press the button for changing the programme Burner The Burner submenu p...

Страница 10: ...to unlock hidden functions in the main menu select function MENU LEVEL PIN and enter the PIN code Maintenance level 1 0 9 0 0 Maintenance level is required for detailed configura tion of the equipment...

Страница 11: ...the SETTINGS menu set the following parameters Set temperature C Boiler set temperature Histeresis on C Temp of the fan speed increase when entering the boiler hysteresis Histeresis off C Temp of the...

Страница 12: ...descing mode Blower in hold pause Blower power ex pressed in after exceeding the preset tempera ture or the maximum exhaust gas temperature Blower in burning off Blower power expressed in after enteri...

Страница 13: ...f recent alarms will be displayed If an alarm is active confirm it by pressing CONFIRM button After acknowl edging the alarm will remain active if still present Ac knowledging the alarm silences the a...

Страница 14: ...ar sensor damage Sensor failure Sensor cable broken 41 Solar tank sensor damage Sensor failure Sensor cable broken 42 Return to solar sensor damage Sensor failure Sensor cable broken 43 Solar T4 senso...

Страница 15: ...the loading chamber in accord ance with the recommendations in section 1 of the Firing Instructions see Chapter 6 Burning Wood 5 To start the firing process enter the BURNER sub menu After selecting...

Страница 16: ...rotective gloves in order to avoid burning of skin When cleaning the boiler never use abrasive or caustic cleaning agents Clean the boiler regularly in order to maintain its efficiency safe operation...

Страница 17: ...move the vermiculite plate see picture bellow 3 Remove turbulators below ash tray 4 Remove the tray 5 Empty the tray remove ash and ash residue Clean thoroughly 6 Clean the chamber 7 Replace the ash d...

Страница 18: ...there is a risk of flashover which in turn causes irregular combustion Carpentry off cuts can be used but should be mixed with other wood All wood over 10 cm must be split Only use untreated and clea...

Страница 19: ...ed VEDEX 4000 is designed for 0 5 m long pieces of wood Stack the wood well when adding Place the logs so that they do not block the grate hole see an example of posi tioning in the images below If sh...

Страница 20: ...nnected higher up on the chimney the lower non active part of the chimney pipe should be filled with sand or sim ilar material Material Area Min height Steel pipe 160 mm 5 0 m Brick 160 x 160 mm 5 0 m...

Страница 21: ...ure rises from the boiler by 15 25 C Remove the turbulators in number order until the flue gas temperature in the chimney is correct The flue gas temperature must not drop be low 65 C 0 5 m below chim...

Страница 22: ...by connecting a hose to the draining valve To meet the environmentally approved requirements during wood firing an accumulator tank of at least 1500 litres must be installed with the boiler VEDEX 400...

Страница 23: ...p starts which then transfers heat from the boiler to the accumulator The thermal valve ensures that the water temperature to the bottom of the boiler does not drop so much that there is a risk of con...

Страница 24: ...e boiler cooling coil then to a suitable drain Overflow water from the safety valve is routed to a drain so that hot water splashes cannot cause injury The entire length of the overflow water pipe mus...

Страница 25: ...25 VEDEX 4000 9 Electrical connection...

Страница 26: ...ctrical socket on the boiler Remove the long nuts securing the fan to the boiler Clean the fan blades carefully to prevent deform ing them Reinstall the fan and connect the electrical cable To prevent...

Страница 27: ...igation NOTE 1 The STB temperature limiter is available on the left cover side in the upper part Temperature limiter 2 Disconnect the boiler power supply cables 3 Loosen the screw holding the plate wh...

Страница 28: ...check and change connection to low exhaust fan rota tion strong chimney draught position the throttle into the smoke flue draught limiter to high ex haust fan rotation bent blades of draw off ventilat...

Страница 29: ...door 8 Adjustable feet 9 Flue gas connection 10 Turbulators top cover 11 Cooling coil 12 Flow line 13 Expansion terminal 14 Dataplates 15 Connection cable electricity 16 Electrical socket for charge p...

Страница 30: ...2 mm E 355 mm F 304 mm G 95 mm H 85 mm I 88 mm J 240 mm K 425 mm L 857 mm Symbol Dimension M 75 mm N 180 mm O 235 mm P 515 mm Q 1119 mm R 85 mm S 474 mm T 413 mm U 500 mm V 1071 mm W 1119 mm X 1241 mm...

Страница 31: ...tions this unit is used for the horizontal flue pipe Collar int 140 mm Lower connector int 160 mm Ext 163 x 117 mm RSK no Soot scraper 1 pcs Ramrod handle 1 pcs Spring steel hand grip 1 pcs Boiler sho...

Страница 32: ...0 x 530 Filler door width mm 300 Filler door height mm 250 Electrical connections including appliance and main switch off A 16 Max permitted total current for connected units A 5 Max operating pressur...

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ...ems Wszystkie ilustracje produk t w fakty i dane bazuj na informacjach dost pnych w czasie zatwierdzenia publikacji Firma NIBE Energy Systems nie ponosi odpowiedzialno ci za b dy techniczne lub drukar...

Отзывы: