Pipe connections ACVM 270
Install as follows:
႑
First drain the boiler water reservoir/heating system if
filled with water.
႑
The shunt valve (EP22-QN12) is located on the flow line
after ACVM 270, before the first radiator in the heating
system 1, see image.
NOTE
Incorrect installation can affect the function.
By-pass valve,
(EP22-QN12)
Connections, Ø 22 mm
LEK
Heating
ACVM 270
Cooling
VCC 22
8
GB
Содержание VCC 22
Страница 2: ......
Страница 19: ...Elschema Wiring diagram Elektrischer schaltplan Sähkökaavio VCC 22 19 VCC 22 ...
Страница 20: ...VCC 22 20 ...
Страница 21: ...21 VCC 22 ...
Страница 22: ...VCC 22 22 ...
Страница 23: ......