Cold and hot water

Connecting cold and hot water

There must be a mixing valve if the temperature can ex-
ceed 60 °C.
The

e hose to the expansion vessel can be installed

in the plugged connection on the safety valve.

Connecting hot water circulation

Titanium MegaCoil 200 & 300 hav

e a connection that allows

hot water circulation.
To reduce the risk of bacterial growth in systems with
hot water circulation, the temperature of the circulating
water should not fall below 50 °C. There should not be
any non-circulatory hot water pipes. Adjust the hot water
system so that the temperature does not fall below 50°C

at the ends of the system.

Docking

Titanium MegaCoil 200 & 300 can be connected in several

ways, one of which is shown here.  

Further option information is available at www.nibe.co.uk
and in the respective assembly instructions for the heat
pumps used.

Chapter 4 |

Pipe connections

13

different

Symbol key

Meaning

Symbol

Venting valve

valve

Non-return valve

Mixing valve
Safety valve

T&P valve

Tundish

Temperature sensor
Circulation pump
Particle
Pressure reduction valve
Motorized valve

3/4”x22 Elbow and drain cock (see p. 6)

Cold water inlet combination valve

Pressure reduction valve, check valve and 
expansion relief valve (see p. 6)

Содержание TITANIUM MEGACOIL 160L

Страница 1: ...Air Source Heat Pump Domestic Hot Water Cylinders TITANIUM MEGACOIL MEGACOIL SOLAR Installer manual...

Страница 2: ......

Страница 3: ...ons 10 T P valve 12 Heat pump 12 Sun 12 Cold and hot water 13 Docking 13 5 Electrical installation 15 Sensors 15 Temperature limiter 16 6 Commissioning and adjusting 17 Filling and venting 17 Start up...

Страница 4: ...iance is not intended for use by persons includ ing children with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given supervision or instruc...

Страница 5: ...stomers a comprehensive guarantee The product is guaranteed for 24 months for parts and labour from the date of installation or 33 months from the date of manufacture whichever is the shorter The NIBE...

Страница 6: ...aller manual MEGA COIL MEGA COIL SOLAR HOT WATER HEATER Air to Water Heat Pump Domestic Hot Cylinders TITANIUM MEGACOIL MEGACOIL SOLAR Installer manual expansion relief valve Pressure reduction valve...

Страница 7: ...pter 3 The water heater design 7 3 The water heater design MEGA COIL 160 200 300 L MEGA COIL SOLAR 200 300 L See page 8 for explanations TITANIUM MEGACOIL 160 200 300 L TITANIUM MEGACOIL SOLAR 200 300...

Страница 8: ...tube for hot water sensor control UA2 Submerged tube for solar sensor control only UA3 Electrical components Temperature limiter motorized valve FD2 Miscellaneous Serial number plate PF 3 Adjustable f...

Страница 9: ...0 mm maximum Tundish Metal discharge pipe from temperature relief valve to tundish Safety device e g temperature relief valve 300 mm minimum Metal discharge pipe from tundish with continous fall Possi...

Страница 10: ...Docking connection w line 22 mm XL9 Docking connection return line 22 mm XL13 Solar w line 22 mm XL14 Solar return line 15 mm XL29 T P valve 10 Chapter 4 Pipe connections Dimensions pipe connections...

Страница 11: ...80 10 11 EPD O ring 29 2x3mm 1 10 2 Mes R r Nippel Overgang G1 22mm 1 10 1 R RNIPPEL OVERG 1 22 MS 1 10 EPS Skumspakning el lokk 1 9 N A Thermodisc 300075 4011 1 7 N A O Ring 38x3 2mm 1 6 N A Element...

Страница 12: ...upply and return are connected to the Titanium Megacoil Solar Coil 12 Chapter 4 Pipe connections T P valve Install the pipe for the T P valve as illustrated on page 9 Heat pump connections Connecting...

Страница 13: ...water pipes Adjust the hot water system so that the temperature does not fall below 50 C at the ends of the system Docking Titanium MegaCoil 200 300 can be connected in several ways one of which is sh...

Страница 14: ...lar heating Mega Coil Solar can be docked to a solar heating system in addition to the F2040 heat pump P BT12 AA25 EB1 BT3 BT1 To air sorce heat pump Mega Coil Mega Coil Solar can be docked with an ai...

Страница 15: ...where it is only possible to connect one sensor use the submerged tube for control sensor UA2 Titanium Megacoil Megacoil Solar can also be supplemented with a solar sensor This is placed in the submer...

Страница 16: ...FD1 is 230 V Connect temperature limiter FD2 and FD3 electrically to the motorized valves one to each heat source Temperature limiter wiring diagram 16 Chapter 5 Electrical installation Immersion hea...

Страница 17: ...ter that comes out of the hot water tap is no longer mixed with air the water heater is full and the tap can be closed Filling and venting the charge coil Filling and venting 1 Open the g valve extern...

Страница 18: ...diagram solar coil Connection w line solar heating system XL13 and connection return line solar heating system XL14 Titanium Megacoil Solar 200 18 Chapter 6 Commissioning and adjusting Titanium Megac...

Страница 19: ...hrough the valve 3 Close the valve by releasing it Ifi t does not close automatically when released turn it anti clockwise slightly NOTE Do not remove or adjust any components that are part of this pr...

Страница 20: ...W 12 12 12 Volume expansion vessel litre 18 18 24 42 Drawn off capacity Cold water temperature 10 C 8 Technical Titanium Megacoil 179 litre Volume net 8 5 litre Volume charge coil 45 59 kg Net weight...

Страница 21: ...5 5 0 55 bar MPa Max pressure water heater 3 0 3 bar MPa Maximum pressure solar coil 16 1 6 bar MPa Max water supply pressure 6 0 0 6 bar MPa Max design pressure 3 0 0 3 bar MPa Exp vessel tap water c...

Страница 22: ...alternative 13 To ground source heat pump 14 M Maintenance 19 General inspection 19 P Pipe connections 9 Cleaning the climate system 8 Cold and hot water 13 Connecting cold and hot water 13 Dimensions...

Страница 23: ......

Страница 24: ...e b e v l a v n o i s n a p x e d n a e v l a v f e i l e r e r u s s e r p d n a e r u t a r e p m e t d e n i b m o c a s a H No s e Y s n o i t a l u g e R g n i d l i u B e h t f o G t r a P o t...

Страница 25: ...mments Signature SERVICE 3 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 4 Date Engineer Name Company Name Telephone Number Comments Signature SERVICE 5 Date Engineer Nam...

Страница 26: ...NIBE Energy Systems Ltd 3C Broom Business Park Bridge Way Chesterfield S41 9QG Phone 0845 095 1200 Fax 0845 095 1201 info nibe co uk www nibe co uk nstaller manual GA COIL SOLAR COIL HOT WATER HEATER...

Отзывы: