
Connections
POWER CONNECTION
The enclosed cable (length 1.8 m) for incoming electricity is
connected to terminal block X1. Outside the heat pump there
is approx. 1.8 m of cable available.
Connection 1 x 230 V
L1 L2 L3
PE
N
X1
Connection 3 x 400 V
L1 L2 L3
PE
N
X1
At installation, install the screwed connection on the rear
of the heat pump. The part of the screwed joint that tensions
the cable must be tightened to a tightening torque above
3.5Nm.
LEK
Incoming supply
Connection
25
Chapter 5 | Electrical connections
NIBE S2125
Содержание S2125
Страница 1: ...Installer manual Air water heat pump NIBE S2125 IHB EN 2212 1 631663 ...
Страница 2: ......
Страница 62: ......