![Nibe RE 10 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/nibe/re-10/re-10_installation-instructions-and-specifications_1686478010.webp)
8
RE 10
GB
Settings
Select “Service” in menu 8.1.1 to gain access to
■
menus 9.0 and the sub-menus.
About FIGHTER 1140/1240/1250
Select “On” in menu 9.2.6, “Room unit” in menu
■
9.2.18 and menu 6.0 becomes available. Settings for
desired room temperature etc can be selected in the
sub-menus to 6.0. (see MOS for 1140/1240/1250
for more information).
About SMO 10/VVM 300
Select “On” in menu 9.3.4 and menu 6.0 becomes
■
available. Settings for desired room temperature etc
can be selected in the sub-menus to 6.0. (see MOS
for SMO 10 / VVM300 for more information).
Electrical installation and wiring must be
carried out in accordance with the stipula-
tions in force.
Note!
J3
Alternative sensor positioning
RE 10 has an integrated room temperature sensor. This
can be spliced and extended if one wishes to measure
the room temperature in a more representative location
in the house.
1. Slacken off the two screws holding the plastic
cover.
2. Unscrew the four screws on the rear side of the
room unit.
3. Remove the installed sensor on spring terminal J3
and connect the new spliced cable.
1
2
3
LEK