General

The installation must only be carried out by competent
personnel.

The enclosed materials are those required for the install-
ations described (see page 17). In special cases, they may
need to be supplemented. If unsure, contact the supplier.
Information regarding applicable standards and regula-
tions must be obtained prior to the installation and
commissioning of the solar panel system. The electrical
installation, and notification to the power supplier, must
be carried out by qualified electricians. The form for the
inverter must be enclosed with the notification (pre-
completed form is available on www.nibe.se) Please note
that the installation must not be put into use until the
power supplier has given its approval.

NOTE

Installation of a solar panel is an extensive inter-
vention on an existing roof. The roof covering,
particularly on converted and inhabited loft
spaces or where the roof's minimum angle is
undersized (relative to the covering), may re-
quire further measures against moisture because
of wind pressure and drifting snow, this must
be evaluated by the installer on a case to case
basis. The roof design must be able to handle
the wind and snow loading that can occur in
the region.

Static load

The installation may only be carried out on roof surfaces
or support constructions with sufficient carrying capacity
and strength. The static load capacity of the roof and
roof construction must if necessary be examined before
the solar panels are installed. Great importance should
be placed on the condition of wood roof structures and
the potential of screwing the mounting devices for the
solar panels to the structure. The roof construction must
be reinforced if necessary. Inspection of the whole solar
panel installation in accordance with DIN 1055 part 4
and 5, or in accordance with country specific regulations
is required, in particular, in areas with snow fall and
strong winds. The characteristics of the installation's
location (prevailing wind direction, whirl winds etc.) must
also be included in the calculation/evaluation of
whether these could mean increased loads. The solar
panels must be installed so that snow drifts from snow
guards or caused by special conditions in the installation
location cannot occur in the vicinity of the solar panels.

The distance from the outer edge of the roof must be at
least 1 m at the sides of roofs and 0.2 m at ridges and
eaves, this is to reduce the risk of the wind ripping the
solar panels off.

The installation system according to DIN 1055 part 5 for
snow zone II is intended for use up to 400 m above sea
level. If the installation is made on a tiled roof, it is recom-
mended that the snow is cleared if it reaches a depth of
more than 30 cm on the solar panels (NOTE! If the snow
has melted, been packed down and then more snow
has fallen and so the density has increased, the snow
may need to be cleared - even though it is not 30 cm
deep.)

If there is a risk that the snow will slide down onto the
panels and in particular behind the rear of raised panels,
snow guards must be installed to prevent this.

Ensure that the material under roofs with roof tiles is
sufficiently stable to support the roof mounting points.
Otherwise the roof must be reinforced. The installer must
evaluate this and make a decision, if uncertain a structur-
al engineer should be consulted. We recommend that
the roof tiles are cut down so that there are no point
loads between the roof and the roof brackets. The min-
imum distance between roof tiles at overlap points and
the underside of the brackets is 3 mm, this is in order to
allow for any movements in the mounting system in re-
action to the loads that occur.

Lightning protection

If external lightning protection is installed, the solar
panels and the roof structure must be integrated so that
the solar panel field is protected from a direct lightning
strike. The combined solar panel area must be located
within the protective area provided by the lightning
protection. A safety distance of 0.5 m in all directions
from the solar panels to the periphery of the protected
area must be observed.

Safety instructions

Applicable safety regulations for working on roofs and
similar constructions must be followed.

Barriers to protect against falling parts must be in-
stalled. This is particularly important for high buildings
and locations where a lot of people pass below the
roof/under the building.

Personal safety equipment or scaffolding must be used
when working on roofs, according to the applic-
able.regulations.

Adequate measures must be taken during the install-
ation so that the solar panel does not come loose and
fall.

Observe the safety distance to the current conducting
cables.

7

Chapter 3 |

Installation

PV Solar package

3 Installation

Содержание PVK 10-10

Страница 1: ...Installer manual PV Solar package IHB GB 1719 2 331825...

Страница 2: ......

Страница 3: ...r pack age 7 3 Installation 7 General 8 Installation and positioning 9 4 Mounting 15 5 Electrical connection 15 Outline diagram 21 6 Commissioning 21 When commissioning 21 Country setting 21 Activatin...

Страница 4: ...symbol indicates tips on how to facilitate using the product Marking Classification of enclosure of electro technical equipment IP General Recovery Leave the disposal of the packaging to the in stall...

Страница 5: ...e livered That the solar panels in particular are undamaged Handling NOTE Avoid knocks and mechanical damage to the solar panel Do not lift the solar panels by the connections Do not place the solar p...

Страница 6: ...between the panels and inverter male and female electrical cable not included 4 4 pcs PV cable with pre installed connectors 7 metres 2 pcs PVK basic kit 10 10 LEK Inverters 1 pcs EME 20 1 pcs PVI in...

Страница 7: ...nels The distance from the outer edge of the roof must be at least 1 m at the sides of roofs and 0 2 m at ridges and eaves this is to reduce the risk of the wind ripping the solar panels off The insta...

Страница 8: ...e located 100 is the insolation at a horizontal surface which in southern Sweden is between 900 and 1200 kWh m year The angle of inclined surfaces is 45 1 Calculate the annual solar radiation using th...

Страница 9: ...ew installation components 1 2 3 4 5 5 6 19 mm Roof bracket location 1 4 5 5 2 3 6 24 mm Before installing solar panels 1 Number of rows of installed solar panels x height of solar panels plus distanc...

Страница 10: ...he lower groove and 1 x screws are located in the upper groove screws not supplied NOTE The distance to the edge X must be the same on both sides Installing the roof brackets in tongue and groove Secu...

Страница 11: ...section must be screwed in to install a seal against the roof sheet A bitumen based roof and building sealant can be used re quired for textured sanded surfaces 3 Install the L profile adjust the heig...

Страница 12: ...on Never use the installed roof brackets as a lad der Installing the mounting rails Mounting rails are secured in the roof brackets with T bolts and locking nuts 8 mm Caution Check that the head of th...

Страница 13: ...e the joint section with rivets into the mounting rail until it catches firmly on the rivet A Slide the next mounting rail in until it also catches on the rivet B Leave a space of 2 mm to compensate f...

Страница 14: ...ting rail and move the solar panel towards the assembly clamp Connect the cable to the previous solar panel Secure the wiring between the solar panels 6 Tighten the assembly clamp tighten to 12 15 Nm...

Страница 15: ...be double insulated and UV weather resistant Photovoltaic cables 4 mm up to 100 m length not supplied The inverter is connected and fused to group central as though it were a load with the same output...

Страница 16: ...d Terminal block AA23 1 4 on the EME 20 board is connec ted to terminal block X4 9 12 on the input board AA3 in the heat pump indoor module control module Terminal block AA23 9 10 on the EME 20 board...

Страница 17: ...1 N L2 L3 1 2 3 4 5 6 7 8 9 X5 1 2 3 4 5 6 7 8 9 X6 X7 X8 X9 FC1 AA101 AA101 AA101 AA101 AA101 1 2 3 4 1 2 3 1 2 3 1 2 3 4 5 X10 A B A B AA3 X7 K1 AA101 K2 K3 C C NO NC K4 C NO NC QN10 GP16 L N L L L...

Страница 18: ...an see the current output and the history In the event of any malfunction you also receive an alarm dir ectly to your e mail which allows you to react quickly This is included if you already have a NI...

Страница 19: ...to the modular system and you will then need 10 x 7 basic kits 10 x inverters and 10 x 7 sets of roof brackets Material If the panels are installed in formations other than that shown in the example a...

Страница 20: ...order to minimise the risk of induced voltages in the event of lightning the return cable must be laid together with connection cables for the panels connected in series Grounding solar panels Solar p...

Страница 21: ...ly in the menu system in NIBE heat pump indoor module control module TIP Also see the Installer Manual for the heat pump indoor module control module Start guide The start guide appears upon first sta...

Страница 22: ...the glass reverse and aluminium frame are undamaged Check that all electrical wiring and connections are intact and not coated with anything Mechanical cleaning is not usually required and is not reco...

Страница 23: ...ons w x h x d 39 24 14 kg Weight 4 2 Max number of strings White Colour 2 Number of trackers MPPT IP65 Enclosure class 40 20 16 16 16 A Recommended fuse rating 057 204 057 203 057 202 057 201 057 200...

Страница 24: ...057 205 1 pcs PRM 11 1 Roof bracket tiled roof Part no 057 181 1 pcs PRM 21 1 Roof bracket sheet metal roof Part no 057 182 1 pcs PRM 41 1 Roof bracket felt roof Part no 057 183 1 pcs PRM 31 1 Roof b...

Страница 25: ...tant information Recovery 4 Safety information 4 L Lightning protection potential compensation 7 M Marking 4 S Safety information 4 Marking 4 Symbols on PV Solar package 4 Safety instructions 7 Static...

Страница 26: ......

Страница 27: ...ustrielle RD 28 Rue du Pou du Ciel 01600 Reyrieux Tel 04 74 00 92 92 E mail info nibe fr www nibe fr FR NIBE Energy Systems Ltd 3C Broom Business Park Bridge Way S419QG Chesterfield Tel 44 0 845 095 1...

Страница 28: ...WS name Gemensamt WS version a375 WS release date 2017 05 16 12 07 Publish date 2017 05 16 15 49 NIBE AB Sweden Hannabadsv gen 5 Box 14 SE 285 21 Markaryd info nibe se www nibe eu 331825...

Отзывы: