Nibe PVK 10-10 Скачать руководство пользователя страница 1

Installer manual

PV Solar package

IHB

 

GB

 

17

19

-

2

 

331825

Содержание PVK 10-10

Страница 1: ...Installer manual PV Solar package IHB GB 1719 2 331825...

Страница 2: ......

Страница 3: ...r pack age 7 3 Installation 7 General 8 Installation and positioning 9 4 Mounting 15 5 Electrical connection 15 Outline diagram 21 6 Commissioning 21 When commissioning 21 Country setting 21 Activatin...

Страница 4: ...symbol indicates tips on how to facilitate using the product Marking Classification of enclosure of electro technical equipment IP General Recovery Leave the disposal of the packaging to the in stall...

Страница 5: ...e livered That the solar panels in particular are undamaged Handling NOTE Avoid knocks and mechanical damage to the solar panel Do not lift the solar panels by the connections Do not place the solar p...

Страница 6: ...between the panels and inverter male and female electrical cable not included 4 4 pcs PV cable with pre installed connectors 7 metres 2 pcs PVK basic kit 10 10 LEK Inverters 1 pcs EME 20 1 pcs PVI in...

Страница 7: ...nels The distance from the outer edge of the roof must be at least 1 m at the sides of roofs and 0 2 m at ridges and eaves this is to reduce the risk of the wind ripping the solar panels off The insta...

Страница 8: ...e located 100 is the insolation at a horizontal surface which in southern Sweden is between 900 and 1200 kWh m year The angle of inclined surfaces is 45 1 Calculate the annual solar radiation using th...

Страница 9: ...ew installation components 1 2 3 4 5 5 6 19 mm Roof bracket location 1 4 5 5 2 3 6 24 mm Before installing solar panels 1 Number of rows of installed solar panels x height of solar panels plus distanc...

Страница 10: ...he lower groove and 1 x screws are located in the upper groove screws not supplied NOTE The distance to the edge X must be the same on both sides Installing the roof brackets in tongue and groove Secu...

Страница 11: ...section must be screwed in to install a seal against the roof sheet A bitumen based roof and building sealant can be used re quired for textured sanded surfaces 3 Install the L profile adjust the heig...

Страница 12: ...on Never use the installed roof brackets as a lad der Installing the mounting rails Mounting rails are secured in the roof brackets with T bolts and locking nuts 8 mm Caution Check that the head of th...

Страница 13: ...e the joint section with rivets into the mounting rail until it catches firmly on the rivet A Slide the next mounting rail in until it also catches on the rivet B Leave a space of 2 mm to compensate f...

Страница 14: ...ting rail and move the solar panel towards the assembly clamp Connect the cable to the previous solar panel Secure the wiring between the solar panels 6 Tighten the assembly clamp tighten to 12 15 Nm...

Страница 15: ...be double insulated and UV weather resistant Photovoltaic cables 4 mm up to 100 m length not supplied The inverter is connected and fused to group central as though it were a load with the same output...

Страница 16: ...d Terminal block AA23 1 4 on the EME 20 board is connec ted to terminal block X4 9 12 on the input board AA3 in the heat pump indoor module control module Terminal block AA23 9 10 on the EME 20 board...

Страница 17: ...1 N L2 L3 1 2 3 4 5 6 7 8 9 X5 1 2 3 4 5 6 7 8 9 X6 X7 X8 X9 FC1 AA101 AA101 AA101 AA101 AA101 1 2 3 4 1 2 3 1 2 3 1 2 3 4 5 X10 A B A B AA3 X7 K1 AA101 K2 K3 C C NO NC K4 C NO NC QN10 GP16 L N L L L...

Страница 18: ...an see the current output and the history In the event of any malfunction you also receive an alarm dir ectly to your e mail which allows you to react quickly This is included if you already have a NI...

Страница 19: ...to the modular system and you will then need 10 x 7 basic kits 10 x inverters and 10 x 7 sets of roof brackets Material If the panels are installed in formations other than that shown in the example a...

Страница 20: ...order to minimise the risk of induced voltages in the event of lightning the return cable must be laid together with connection cables for the panels connected in series Grounding solar panels Solar p...

Страница 21: ...ly in the menu system in NIBE heat pump indoor module control module TIP Also see the Installer Manual for the heat pump indoor module control module Start guide The start guide appears upon first sta...

Страница 22: ...the glass reverse and aluminium frame are undamaged Check that all electrical wiring and connections are intact and not coated with anything Mechanical cleaning is not usually required and is not reco...

Страница 23: ...ons w x h x d 39 24 14 kg Weight 4 2 Max number of strings White Colour 2 Number of trackers MPPT IP65 Enclosure class 40 20 16 16 16 A Recommended fuse rating 057 204 057 203 057 202 057 201 057 200...

Страница 24: ...057 205 1 pcs PRM 11 1 Roof bracket tiled roof Part no 057 181 1 pcs PRM 21 1 Roof bracket sheet metal roof Part no 057 182 1 pcs PRM 41 1 Roof bracket felt roof Part no 057 183 1 pcs PRM 31 1 Roof b...

Страница 25: ...tant information Recovery 4 Safety information 4 L Lightning protection potential compensation 7 M Marking 4 S Safety information 4 Marking 4 Symbols on PV Solar package 4 Safety instructions 7 Static...

Страница 26: ......

Страница 27: ...ustrielle RD 28 Rue du Pou du Ciel 01600 Reyrieux Tel 04 74 00 92 92 E mail info nibe fr www nibe fr FR NIBE Energy Systems Ltd 3C Broom Business Park Bridge Way S419QG Chesterfield Tel 44 0 845 095 1...

Страница 28: ...WS name Gemensamt WS version a375 WS release date 2017 05 16 12 07 Publish date 2017 05 16 15 49 NIBE AB Sweden Hannabadsv gen 5 Box 14 SE 285 21 Markaryd info nibe se www nibe eu 331825...

Отзывы: