Nibe PUB2 160 Скачать руководство пользователя страница 20

Installation

NOTE

Fit the enclosed cover discs before pipe installa-
tion. The cover discs, with self-adhesive backs,
must be installed on the relevant connection,
by pushing them over the connections.

All connections (including connections or holes
left by the lifting eyes that are not used) must
be insulated to minimise energy losses.

Pipe installation

NOTE

The water heater must be filled with water be-
fore charging via the charge coil is started.

Pipe installation must be carried out in accordance with
current norms and directives.

The water heater must be fitted with the requisite valves,
such as a safety valve, shut-off valve, non-return valve
and vacuum valve.

The water heater must be provided with a mixer valve,
which limits the temperature of outgoing hot water to
60 °C. If this valve is not fitted, some other measure must
be taken to prevent the risk of scalding.

Internal support bushes must be fitted when a plastic or
annealed copper pipe is used. An overflow pipe must be
routed from the safety valve to a suitable drain. The
overflow pipe must be the same size as the safety valve.
Route the overflow pipe from the safety valve, sloping
along its entire length and ensure that it is frost proof.
The mouth of the overflow pipe must be visible and not
placed close to electrical components.

Filling

Fill the water heater as follows:
1. Open a hot water tap in the system.
2. Open the shut-off valve on the incoming cold water.

This valve should then be fully open during opera-
tion.

3. The hot water tap can only be shut off when the

water heater is filled, which is when only water
comes out of the tap (initially an air-water mixture
comes out of the tap).

Charge coil

When determining the water speed, 1,5 m/s should not
be exceeded in the event of continuous charge flow.
This is equivalent to a water flow of approx. 1650 l/h for
a Ø22 mm charge coil (PUB2/PUB2 DS 160-500).

The supply temperature to the charge coil must not ex-
ceed 120 °C and the working temperature in the water
heater must not exceed 95 °C for PUB2 DS 160-300 and
90 °C for PUB2 DS 500.

The risk of air bubbles in the charge coil is eliminated
because the intake connection is the highest point.

Pressure drop diagram

Primary side (coil)

2. PUB2 DS 160/300/500

1. PUB300/PUB500

3. PUB160/PUB210

0

5

10

15

20

25

30

35

40

Pressure drop [kPa]

0

100

200

300

400

500

600

700

800

900

1000

1100

1200

1300

1400

1500

1600

1700

Charge flow [l/h]

Pressure drop over coil

1

2

3

Pressure drop over coil

Flow (l/h)

(kPa)

PUB2/PUB2 DS 160-500 | GB

20

Содержание PUB2 160

Страница 1: ...K PUB2 PUB2DS160 500 SE Anv ndar och installat rshandbok PUB2 PUB2 DS 160 500 GB User and Installer manual PUB2 PUB2 DS 160 500 NL Gebruikers en installateurshandleiding PUB2 PUB2 DS 160 500 CHB 1707...

Страница 2: ......

Страница 3: ...installat ren 11 Tekniska uppgifter English 14 Important information 15 For the User 16 For the Installer 21 Technical data Nederlands 24 Belangrijke informatie 25 Voor de gebruiker 26 Voor de instal...

Страница 4: ...kten r uttj nt f r den inte sl ngas bland vanligt hush llsavfall Den ska l mnas in till s rskilda avfallsstationer eller till terf rs ljare som tillhandah ller denna typ av service Felaktig avfallshan...

Страница 5: ...innan den tas i bruk Kontrollen f r endast utf ras av person som har kompetens f r uppgiften Datum Signatur Anm rkning Beskrivning Varmvatten sida 10 Avst ngningsventiler Kallvatten sida 10 Avst ngni...

Страница 6: ...St ng inkommande fl det till laddslingan 2 St ng inkommande kallvatten 3 Lossaavtappningsventilenslockochmonteral mplig slang 4 ppna avtappningsventilen Vid t mning m ste luft tillf ras beredaren geno...

Страница 7: ...best r av gr plast PUB2 PUB2 DS 160 500 r f rsedd med dykr r f r styr ning av varmvattenberedningen Transport PUB2 PUB2 DS 160 500 ska transporteras och f rvaras st ende och torrt Vid inforsling i byg...

Страница 8: ...CV in CV ut CV in vv kv FRONT vv kv FRONT PF3 UL1 QM4 UA2 UA1 Ben mning Beteckning Avtappningsventil QM4 Dykr r dockning v rmepump BT6 11 mm inv UA1 Dykr r extern v rmek lla sol 11 mm inv UA2 St llbar...

Страница 9: ...meter blir ca 200 mm mindre utan isoleringsmantlar Isolering borttagen Anv nd inga verktyg f r demon terting av skarvskenan Bilden visar PUB2 DS 500 med isolering UN PUB UN PUB termontering sker i omv...

Страница 10: ...l att det r frostfritt anordnat Mynningen p spillr ret ska vara synlig och inte vara placerad i n rheten av elektriska komponenter P fyllning P fyllning av varmvattenberedaren sker genom att 1 ppna en...

Страница 11: ...A B 100 V v K v Endast PUB DS 300 PUB DS 500 PUB PUB2 500 20 55 53 1757 295 601 907 100 100 100 879 852 PUB2 DS PUB2 300 160 300 210 160 170 170 170 170 170 A 115 115 115 115 115 B 30 65 30 65 30 65 3...

Страница 12: ...lutning 35 mm 22 mm Kallvattenanslutning XL3 35 mm 22 mm Varmvattenanslutning XL4 22 mm Dockningsanslutning inkommande fr n annan v rmk lla XL8 22 mm Dockningsanslutning utg ende fr n annan v rmk lla...

Страница 13: ...0 1300 1200 1200 l h Prim rt fl de 1150 1150 600 880 880 730 580 l h Kontinuerlig vv kapacitet 80 10 45 C 47 47 24 39 39 29 26 kW V rme verf ring 80 10 45 C 62 35 35 28 min Uppv rmningstid 80 10 60 C...

Страница 14: ...o facilitate using the product General Serial number The serial number can be found on top of the product Caution Always give the product s serial number when reporting a fault Recovery Leave the disp...

Страница 15: ...arge coil 2 Shut off the incoming cold water 3 Loosen the cover of the drain valve and install a suitable hose 4 Open the drain valve During draining air must be let into the water heater by loosening...

Страница 16: ...ey plastic PUB2 PUB2 DS 160 500 is equipped with submerged tube for control of hot water heating Transport PUB2 PUB2 DS 160 500 should be transported and stored vertically in a dry place The PUB2 PUB2...

Страница 17: ...ut CV in vv kv FRONT vv kv FRONT PF3 UL1 QM4 UA2 UA1 Name Designation Tapping valve QM4 Submerged tube docking heat pump BT6 11 mm int UA1 Submerged tube external heat source solar 11 mm int UA2 Adju...

Страница 18: ...op and the top insulation Remove the joining plates holding the insulated jacket halves together Do not use any tools when dismant ling Unhook and remove the insulated jacket halves the outer diameter...

Страница 19: ...he hole for the lifting eye Finally fit all the enclosed cover discs on each connection by pressing them over the connections NOTE Fit the cover discs and the insulation plugs be fore installing the p...

Страница 20: ...ng along its entire length and ensure that it is frost proof The mouth of the overflow pipe must be visible and not placed close to electrical components Filling Fill the water heater as follows 1 Ope...

Страница 21: ...100 V v K v Endast PUB DS 300 PUB DS 500 PUB PUB2 500 20 55 53 1757 295 601 907 100 100 100 879 852 PUB2 DS PUB2 300 160 300 210 160 170 170 170 170 170 A 115 115 115 115 115 B 30 65 30 65 30 65 30 65...

Страница 22: ...ion 35 mm 22 mm Cold water connection XL3 35 mm 22 mm Hot water connection XL4 22 mm Docking connection incoming from another heat source XL8 22 mm Docking connection outgoing from another heat source...

Страница 23: ...2x1000 100 1300 1300 1200 1200 l h Primary flow 1150 1150 600 880 880 730 580 l h Continuous hw capacity 80 10 45 C 47 47 24 39 39 29 26 kW Heat transfer 80 10 45 C 62 35 35 28 min Heating time 80 10...

Страница 24: ...l duidt tips aan om het gebruik van het product te vergemakkelijken Algemeen Serienummer Het serienummer staat boven op het product LET OP Vermeld bij het doorgeven van een storing altijd het serienum...

Страница 25: ...e aanvoer naar de spiraal 2 Sluit de koudwatertoevoer af 3 Neem de afdekking van de aftapklep los en installeer een geschikte slang 4 Open de aftapklep Tijdens het aftappen moet in de boiler lucht wor...

Страница 26: ...60 500 is uitgerust met een dompelbuis om de tapwaterverwarming te kunnen regelen Transport De PUB2 PUB2 DS 160 500 dient verticaal en droog te worden vervoerd en opgeslagen Tijdens het naar binnen dr...

Страница 27: ...CV in CV ut CV in vv kv FRONT vv kv FRONT PF3 UL1 QM4 UA2 UA1 Naam Aanduiding Aftapkraan QM4 Dompelbuis aansluiting warmtepomp BT6 11 mm int UA1 Dompelbuis externe warmtebron zonne energie 11 mm int U...

Страница 28: ...isolatie weg Verwijder de verbindingsplaten die de isolatiemantel helften bij elkaar houden Gebruik geen gereedschap pen bij het demonteren Haak de isolatiemantelhelften los en verwijder deze De buite...

Страница 29: ...ening voor het hijsoog Bevestig tot slot op elke verbinding alle bijgeleverde rosetten door deze op de verbindingen te drukken Voorzichtig Bevestig de afdekschijven en de isolatiedoppen voordat u de l...

Страница 30: ...lengte schuin omlaag en zorg ervoor dat deze vorstbestendig is De uitstroomopening van de afvoerleiding moet zichtbaar zijn en mag niet te dicht bij elektrische componenten worden geplaatst Vullen Vul...

Страница 31: ...0 V v K v Endast PUB DS 300 PUB DS 500 PUB PUB2 500 20 55 53 1757 295 601 907 100 100 100 879 852 PUB2 DS PUB2 300 160 300 210 160 170 170 170 170 170 A 115 115 115 115 115 B 30 65 30 65 30 65 30 65 3...

Страница 32: ...sluiting 35 mm 22 mm Koudwateraansluiting XL3 35 mm 22 mm Warmtapwateraansluiting XL4 22 mm Koppelingsaansluiting inkomend vanuit een andere warmtebron XL8 22 mm Koppelingsaansluiting uitgaand naar ee...

Страница 33: ...1200 1200 l u Primaire aanvoer 1150 1150 600 880 880 730 580 l u Continue warmwatercapaciteit 80 10 45 C 47 47 24 39 39 29 26 kW Warmteoverdracht 80 10 45 C 62 35 35 28 min Opwarmtijd 80 10 60 C Kope...

Страница 34: ......

Страница 35: ......

Страница 36: ...WS name Gemensamt WS version a345 working edition Publish date 2017 04 05 11 46 NIBE AB Sweden Hannabadsv gen 5 Box 14 SE 285 21 Markaryd info nibe se www nibe eu 431337...

Отзывы: