INSTALLATION OF ICP 10 IN ENAMEL
WATER HEATER

1.

Drain the water heater, if necessary.

2.

Remove any existing magnesium sacrificial anodes.

3.

Screw in the titanium anode and install the earth
washer.

NOTE

The threaded sleeve is supplied with a PT-
FE sealing ring. If this sealing ring is dam-
aged, the joint must be sealed with thread
sealant, such as tow or PTFE thread tape.

4.

Place the fork terminal on the cable marked earth
connection on the earth washer.

5.

Install the flat pin sleeve on the titanium anode’s flat
pin (2) and the connection cable on the water heater
(1).

6.

Attach the large female connection to the large flat
pin and the small one to the small flat pin on the
voltage converter.

7.

Fill the water heater with water and check that it is
sealed.

8.

Check that the indicator lamp on the voltage convert-
er is green, see page

13

.

L

EK

L

EK

L

EK

L

EK

2

1

Installation of ICP 10 in the Eminent 55 -E

As there is a risk of the anode moving towards the im-
mersion heater or the hot water pipe in Eminent 55 -E
when installing ICP 10, the anode must be bent as illus-
trated here.

140

~ 225

30°

~ 112

FUNCTION CHECK

Function check, anode

Check the polarity. The operating voltage U should be
greater than +2,3 VDC. This measurement must be
made with the tank filled with water and the mains-
powered voltage converter connected.

Caution

ICP 10 is only active when the tank is filled with
water.

• Indicator lamp green: Mains voltage is connected and

ICP 10 is ready for operation.

• Indicator lamp not on: Probably no mains voltage.

• Indicator lamp flashes red: Malfunction in the system.

NOTE

If the indicator lamp starts to flash immediately
after installation, it is probably due to incorrect
installation. To perform troubleshooting, see
the section "Dealing with malfunctions", page

15

.

DEALING WITH MALFUNCTIONS

NOTE

Electrical installation and service must be car-
ried out under the supervision of a qualified
electrician, and in accordance with applicable
electrical safety regulations.

Many faults can be identified by checking the system’s
DC voltage, current, polarity, insulation and resistance,
and are easily resolved. Disconnect any immersion
heater from the mains. The checks described may only
be carried out by authorised electricians.

Indicator lamp not on

Check that the voltage converter is connected to the
mains supply.

• Mains supply failure.

15

ICP 10 | GB

Содержание ICP 10

Страница 1: ...Anv ndar och installat rshandbok Likstr msanod SE User and installer manual Direct current anode GB Benutzer und Installateurhandbuch Fremdstromanode DE CHB 1822 3 031399 ICP 10 LEK...

Страница 2: ......

Страница 3: ...rmation 6 Anv ndarhandbok 7 Installat rshandbok English 11 Important information 13 User manual 14 Installer manual Deutsch 18 Wichtige Informationen 20 Benutzerhandbuch 21 Installateurhandbuch 3 ICP...

Страница 4: ...en av emballaget till den installat r som installerade produkten eller till s rskilda avfallsstationer N r produkten r uttj nt f r den inte sl ngas bland vanligt hush llsavfall Den ska l mnas in till...

Страница 5: ...n underg installationskontroll innan den tas i bruk Kontrollen f r endast utf ras av person som har kompetens f r uppgiften Datum Signatur Anm rkning Beskrivning Varmvatten Avst ngningsventiler Kallva...

Страница 6: ...inte vara i drift i mer n tv m nader utan att vatten tappas fr n den G rs inte detta finns risk f r gasbildning vilket ofta visar sig som gurglande ljud i tank och ledningar S kerhetsvarningar g llan...

Страница 7: ...avbrott m ts potentialskillnaden mellan ti tananoden och varmvattenberedarens innerv gg och denna sp nning verf rs till sp nningsomvandlaren och j mf rs d r med den inst llda sp nningen b rsp nning en...

Страница 8: ...skiss 140 225 30 112 FUNKTIONSKONTROLL Funktionskontroll anod Kontrollera polariteten Drivsp nningen U ska verstiga 2 3 VDC Denna m tning ska g ras med tanken vatten fylld och den n tanslutna sp nning...

Страница 9: ...fungerar inte det katodiska korrosionsskyddet Detta kan intr ffa om titananoden r kortsluten till beredaren exempelvis till f ljd av defekt t tning eller om anoden r i kontakt med komponenter inne i...

Страница 10: ...max 10 V vid 100 mA Drivsp nning sekund r 0 40 C Temperatur n tansluten sp nningsomvandlare II Skyddsklass IP20 Kapslingklass 100 mm L ngd utan n tstickkontakt 50 mm Bredd utan n tstickkontakt 40 mm...

Страница 11: ...2018 SYMBOLS NOTE This symbol indicates danger to person or ma chine Caution This symbol indicates important information about what you need to consider when in stalling servicing or maintaining the i...

Страница 12: ...ng installation to be inspected before it is commissioned The inspection must be carried out by a suitably qualified person Date Signature Notes Description Hot water Shut off valves Cold water Shut o...

Страница 13: ...for more than two months without the water being drained If this is not done there is a risk of gas forming which often re veals itself in the form of gurgling noises in the tank and pipes Safety war...

Страница 14: ...e interruptions the potential difference between the titanium anode and the water heater s inner wall is measured and this voltage is transferred to the voltage converter and is compared there to the...

Страница 15: ...here 140 225 30 112 FUNCTION CHECK Function check anode Check the polarity The operating voltage U should be greater than 2 3 VDC This measurement must be made with the tank filled with water and the...

Страница 16: ...eater If the operating voltage is close to zero the cathodic corrosion protection does not work This can happen if the titanium anode is short circuited to the water heater for example as a result of...

Страница 17: ...10 V at 100 mA Operating voltage secondary 0 40 C Temperature mains powered voltage converter II Enclosure class IP20 Enclosure class 100 mm Length without mains plug 50 mm Width without mains plug 40...

Страница 18: ...hr f r Personen und Maschinen ACHTUNG Dieses Symbol kennzeichnet wichtige Informa tionen dar ber was bei Installation Wartung oder Service der Anlage zu beachten ist TIP Dieses Symbol kennzeichnet Tip...

Страница 19: ...kontrolle gem den geltenden Vorschriften zu unterziehen Diese Kontrolle darf nur von sachkundigen Personen ausgef hrt werden Datum Unter schrift Anmerkung Beschreibung Brauchwasser Absperrventile Kalt...

Страница 20: ...attfindet Andernfalls besteht die Gefahr f r eine Gasbildung was sich oft durch gurgelnde Ger usche im Speicher und in den Leitungen bemerkbar macht Sicherheitswarnungen f r den Brauchwasserspeicher m...

Страница 21: ...node und Innenwand des Brauchwasserspeichers gemessen Diese Spannung wird zum Spannungswandler berf hrt und dort mit der eingestellten Spannung Sollspannung verglichen Dar aufhin wird der Schutzstrom...

Страница 22: ...10 stattfindet sollte die Anode gem dieser Skizze gebo gen werden 140 225 30 112 FUNKTIONSKONTROLLE Funktionskontrolle Anode Kontrollieren Sie die Polarit t Die Betriebsspannung U muss 2 3 V GS berst...

Страница 23: ...besonders niedrige Leitf higkeit auf kann die Be triebsspannung h her ausfallen Abweichungen vom Nennwert Eine h here Betriebss pannung bis zu 10 V kann auf eine nichtisolierte Elek troheizpatrone au...

Страница 24: ...ass das Wasser keine elektrische berleitung verur sacht Verbinden Sie die Elektroden des Instruments mit der Titananode und dem emaillierten Speicher Lesen Sie den Widerstand ab Nennwert Hoher Widerst...

Страница 25: ...ei 100 mA Betriebsspannung sekund r 0 40 C Temperatur netzverbundener Spannungswandler II Schutzklasse IP20 Schutzart 100 mm L nge ohne Netzsteckeranschluss 50 mm Breite ohne Netzsteckeranschluss 40 m...

Страница 26: ......

Страница 27: ......

Страница 28: ...Systems All product illustrations facts and specifications are based on current information at the time of the publication s approval NIBE Energy Systems makes reservations for any factual or printing...

Отзывы: