Nibe Fighter 200P Скачать руководство пользователя страница 5

FIGHTER 200P consists of an electric boiler with cop-
per lined  water heater and a heat pump that recovers
energy from ventilation air.  The recovered energy is
supplied to the heat pump. The heat pump must be
installed in a ventilation system intended for mechani-
cal exhaust air.

The output of the immersion heater is 3,0 kW. When
the exhaust air at room temperature passes through
the evaporator, the refrigerant evaporates because of
its low boiling point. In this way the heat in the air is
transferred to the refrigerant.

The refrigerant is then compressed in a compressor,
causing the temperature to rise considerably.

The warm refrigerant is led to the condenser. Here the
refrigerant gives off its heat to the boiler water, so that
the temperature of the the refrigerant drops and its
phases changes from gas to liquid. The refrigerant
then goes via a filter to the expansion valve, where the
pressure drops and the temperature is lowered fur-
ther.

The refrigerant has now completed its circulation and
returns to the evaporator.

System description

Frånluft

Avluft

3

For Home Owners

Principle of operation

System diagram

FIGHTER 200P

Extract air

Exhaust air

LEK

C

When the room air has
passed through the heat
pump it is discharged. The
temperature of the air has
been significantly reduced
as the heat pump has
extracted the energy in the
room air.

G

The air from the kitchen
fan goes directly out into
a separate duct.

B

The warm room
air is fed to
FIGHTER 200P

D

FIGHTER 200P supplies
the house with both hot
water and room heating.

E

Outdoor air is drawn into the house.

A

The warm room air is
drawn into the air duct
system.

F

Air is transported
from rooms with
outdoor air devices to
rooms with exhaust
air devices.

Содержание Fighter 200P

Страница 1: ...L E K 2 3 1 20 100 40 80 60 C 0 120 T G R INSTALLATION AND MAINTENANCE INSTRUCTIONS FIGHTER 200P Immersion heater 3 kW MOS GB 0511 1 511052 FIGHTER 200P...

Страница 2: ...LEK Fighter 310P Fighter 310P LEK Fighter 310P Fighter 310P 1 2 LEK Fighter 310P Fighter 310P LEK Fighter 310P Fighter 310P 3 4 5...

Страница 3: ...17 Freezing protection and hot water prioritising 17 Service Opening the cover on the distribution box 18 Refrigerant system 18 Electrical circuit diagram Electrical circuit diagram 19 Component loca...

Страница 4: ...talled If corresponding with NIBE kindly state the serial number 103 of the FIGHTER 200P 089_ _ _ _ _ _ _ _ _ _ _ Maxiumum water supply pressure 16 bar Operating pressure tap water 6 bar Expansion ves...

Страница 5: ...e refrigerant drops and its phases changes from gas to liquid The refrigerant then goes via a filter to the expansion valve where the pressure drops and the temperature is lowered fur ther The refrige...

Страница 6: ...ater and circulation pump operational on demand 3 Standby mode Fan is operational Compressor is not operational Immersion heater and circulation pump operational on demand Pressure gauge Here the pres...

Страница 7: ...ith water Check that the filter is not damaged New original filters can be ordered from NIBE Re assembly takes place in the reverse order The cleaning time intervals vary depending on the amount of du...

Страница 8: ...ty valve 104 does not normally release water The safety valves must be checked regularly Check one valve at a time as follows Open the valve Check that water flows through the valve Close the valve Th...

Страница 9: ...Thermostat 3 for immersion heater set too low Low temperature or a lack of hot water Circuit or main MCB tripped RCD if fitted tripped Temperature limiter 6 tripped Contact service Wrongly set room t...

Страница 10: ...the button on top of it see figure The pressostats are within reach by ope ning the filter box High pressure pressostat Low pressure pressostat Normally this pressostat resets automati cally so it do...

Страница 11: ...200 weighs roughly 435 kilos the floor must stand such a weight The heat pump should be transported and stored ver tically in the dry The heat pump contains highly inflam mable refrigerant Special car...

Страница 12: ...Discharge pipes from tundishes shall have av vertical section of pipe at least 300 mm long before any elbows or bends in the pipework See following picture General If the vertical distance 300 mm is h...

Страница 13: ...heat pump is connected so that any contaminants do not damage the components parts Hot and cold water are connected to pos 74 hot water and 73 cold water The attendant expansion vessel 107 must be con...

Страница 14: ...This is especially important if there are exhaust air devices in bedrooms Because the heat pump contains a flammable refrigerant in the form of propane R290 the air ducting system must be earthed Thi...

Страница 15: ...ally a room thermostat is used controlling the starts and stops of the circulation pump When the set room temperature is reached the circulation pump is stopped and starts again when the temperature d...

Страница 16: ...e room thermostat Room thermostat RT 10 9 Install the room thermostat in a neutral position where the set temperature is required A suitable place is on a free inner wall in a hall approx 1 5 m above...

Страница 17: ...52 and the rest of the heating system through the relevant venting valves Keep topping up and venting until all air has been removed and the pressure is correct Filling the heating system Venting the...

Страница 18: ...over 80 from the valve 51 Screw on the hose coupling and open the valve 51 Open the safety val ve 52 to let air into the system Draining the heating system Readjustment Draining the water heater Set t...

Страница 19: ...es slight ly negative Also note that while this heating the immersion heater is operational although the power switch is set to 1 Periodical temperature increase NOTE Periodical temperature increase i...

Страница 20: ...t rests on stops on eit her side of the front panel Work on the refrigerant system must be done by authorised personnel in accor dance with the relevant legislation on refrigerants supplemented by add...

Страница 21: ...0P T T 9 86 25 15 34 94 88 8 3 6 54 1 16 11 18 57 20 36 N L L1 N P P 27 26 28 41 33 T 82 82 13 Brown Blue Black C R S 2 1 5 3 4 6 L ge 0 L ge 1 L ge 2 L ge 3 AC DC 230 V 12 V Rel 3 Rel 1 Rel 2 69 22 T...

Страница 22: ...30 Fram ledning radiatorer 9 3 6 11 18 59 16 17 44 70 5 19 78 27 36 33 58 108 52 96 109 97 42 62 48 63 87 65 99 ter ledning radiatorer k v v v 41 35 51 80 71 50 79 74 47 84 98 85 43 53 1 k v v v Blaha...

Страница 23: ...n 54 Fan transformer 57 Working capacitor for exhaust air fan 58 Tension load stop for feeding conductor 59 Tension load stop for room thermostat conductor 62 Evaporator 63 Air filter 65 Filter drier...

Страница 24: ...5 C 355 600 2095 440 115 295 70 35 40 20 35 70 A B and C see Connection in Component list Pipes must not be run from the floor in the area indicated by dots A clear space of 500 mm is needed in front...

Страница 25: ...or the Installer FIGHTER 200P Accessories Expansion vessel tap water is delivered separately LEK 107 Room thermostat RT 10 Part no 418 366 L E K 1 0 15 20 2 5 3 0 C LEK Heightening console Height 125...

Страница 26: ...t excl feet 15 40mm 2 095 mm Width 600 mm Net weight 195 kg Volume in double jacket 70 liter Expansion vessel volume tap water 18 liter Max operating current 16 7 A Circulation pump power rating 100 W...

Страница 27: ......

Страница 28: ...NIBE AB SWEDEN R Tel 46 0 433 73 000 Fax 46 0 433 73 190 E mail info nibe se www nibe com Box 14 J rnv gsgatan 40 SE 285 21 MARKARYD...

Отзывы: