![Nibe ESV 28 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/nibe/esv-28/esv-28_installation-instructions-manual_1686554013.webp)
Temperature sensor installation
K
Install the temperature sensor with cable ties with the heat
conducting paste and aluminium tape.
Then insulate with supplied insulation tape.
NOTE
Sensor and communication cables must not be placed
near power cables.
Program settings
႑
Select “Service” in menu 8.1.1 to gain access to menus
9.0 and the sub-menus.
႑
Then select “Heating”, "H Cooling" or "Cooling"
in menu 9.3.4, “Heating system 2”. Menu 3.0 and its sub-
menus become accessible.
႑
In the sub-menus the curve co-efficient 2, offset heat
curve 2 and min- and max levels for the flow line temper-
ature 2 are set in the same way as heat system 1 under
menu 2.0.
See “Installation and Maintenance Instructions” for NIBE
SPLIT.
13
ESV 28
GB
Содержание ESV 28
Страница 2: ......
Страница 8: ...ESV 28 8 SE...
Страница 14: ...ESV 28 14 GB...
Страница 20: ...ESV 28 20 DE...
Страница 26: ...ESV 28 26 FI...
Страница 27: ...Elschema Wiring diagram Elektrischer schaltplan S hk kaavio ESV 28 27 ESV 28...
Страница 28: ...ESV 28 28...
Страница 29: ...29 ESV 28...
Страница 30: ...ESV 28 30...
Страница 31: ......