Nibe AHPS Скачать руководство пользователя страница 10

General

Pipe installation must be carried out in accordance with
current norms and directives.

Internal support bushes should be fitted when a plastic
or annealed copper pipe is used. The accumulator tank
must be fitted with the requisite valves, such as a safety
valve, shut-off valve and non-return valve. An overflow
pipe should be routed from the safety valve to an ap-
propriate drain. The overflow pipe must be the same
size as the safety valve. Route the overflow pipe from
the safety valve enclosed along its entire length and
ensure that it is frost proof. The mouth of the overflow
pipe must be visible and not placed close to electrical
components.

Maximum boiler and radiator volumes

For installation in pressurized systems, the system must
be equipped with a pressure expansion vessel pre-
pressurised to 0.5 bar (5 mvp).

Internal volume in AHPS for calculating expansion
vessel is 270 l. The expansion vessel's volume must be
at least 10 % of the system's total volume.

Example table

Volume (l) expansion
vessel

Total volume (l) (accumu-
lator tank and radiator
system)

50

500

70

700

100

1000

NOTE

Expansion vessel not supplied with the
product. Equip the product with an expansion
vessel.

The initial pressure of the pressure expansion vessel
must be dimensioned according to the maximum
height (H) between the vessel and the highest posi-
tioned radiator. A pre-pressure of 0.5 bar (5 mvp)
means a maximum permitted height difference of 5
m.

If the pre-pressure in the pressure vessel is not high
enough it can be increased by adding air via the valve
in the expansion vessel. The expansion vessel's pre-
pressure must be entered in the check list on page 4.
Any change in the pre-pressure affects the ability of
the expansion vessel to handle the expansion of the
water.

System diagram

XL19

XL18

XL45

XL46

XL47

XL18

XL19

AHP

AHPS

XL45

AHP

AHP consists of a vessel with accumulated volume. AHP
connected to AHPS.

AHPS

AHPS consists of a vessel with a number of connections,
which makes it possible to dock the accumulator tank
to external units. By using the different levels in the
tank, heat can be retrieved and supplied to the tank in
several versions. Use for example level 2 and 3 to re-
trieve solar heat to heat a pool. The heat between level
2 and the top of the tank is then intended to preheat
the hot water to the heat pump.

Docking connection, supply line high temper-
ature (from external heat source)

XL 18

Docking connection, return line high temper-
ature (to external heat source)

XL 19

Docking connection, level 1

XL 45

Docking connection, level 2

XL 46

Docking connection, level 3

XL 47

AHP/AHPS

Chapter 4 |

Pipe connections

10

4 Pipe connections

Содержание AHPS

Страница 1: ...Installer manual AHP AHPS Accumulator tank IHB GB 1544 4 231351...

Страница 2: ...al 11 Dimensions and pipe connections 12 Heat pump 12 Sun 12 Cold and hot water 13 AHP and AHPS 13 Installation alternative 15 5 Electrical installation 15 Sensors 16 6 Commissioning and adjusting 16...

Страница 3: ...ion This symbol indicates important information about what you should observe when main taining your installation TIP This symbol indicates tips on how to facilitate using the product Serial number Se...

Страница 4: ...tion must be carried out by a suitably qualified person Date Signature Notes Description Heat pump page 12 Shut off valves Expansion vessel Safety valve Hot water page 12 Shut off valves Mixing valve...

Страница 5: ...ue du Pou du Ciel 01600 Reyrieux FR Tel 04 74 00 92 92 Fax 04 74 00 42 00 E mail info nibe fr www nibe fr NIBE Energy Systems Ltd 3C Broom Business Park Bridge Way Chesterfield S41 9QG GB Tel 0845 095...

Страница 6: ...in a dry place However the AHP AHPS may be carefully laid on its back when being moved into a building R 0 R 0 Assembly 30 50 mm 30 50 mm 15 40 mm The area where AHP AHPS is located must be equipped w...

Страница 7: ...bottom edge and up LEK LEK LEK The side covers can be removed to facilitate the install ation 1 Remove the screws from the upper and lower edges 2 Twist the cover slightly outward 3 Move the hatch ba...

Страница 8: ...LEK XL8 XL4 XL3 XL9 PF3 AHP AHPS UL UL UA2 UA2 UA3 UA1 UA1 XL3 XL4 XL18 PF1 XL19 XL18 XL13 XL14 XL45 XL46 XL47 PF1 XL19 QM1 XL45 AHP AHPS Chapter 3 Accumulator tank design 8 3 Accumulator tank design...

Страница 9: ...ource XL19 Docking connection level 1 XL45 Docking connection level 2 only AHPS XL46 Docking connection level 3 only AHPS XL47 HVAC components Drain valve heating medium only AHPS QM1 Submerged tube f...

Страница 10: ...ssure expansion vessel must be dimensioned according to the maximum height H between the vessel and the highest posi tioned radiator A pre pressure of 0 5 bar 5 mvp means a maximum permitted height di...

Страница 11: ...1800 595 190 110 110 105 180 225 270 80 560 600 300 300 290 440 60 55 370 55 195 245 245 1800 595 10 180 225 270 80 560 600 300 300 290 440 60 55 370 55 Connection AHPS ext G20 QM1 Draining valve 22...

Страница 12: ...ed to AHPS Cold and hot water Connecting cold and hot water There must be a mixer valve if the temperature can exceed 60 C Symbol key Meaning Symbol Venting valve Shut off valve Mixing valve Level ves...

Страница 13: ...ctive assembly instructions for the heat sources used Symbol key Meaning Symbol Venting valve Shut off valve Mixing valve Level vessel Control valve Safety valve Thermometer T Temperature sensor Expan...

Страница 14: ...eating system when the system volume is not sufficient or to reduce heat spikes CP1 CP2 QM60 EB100 To ground source heat pump AHP AHPS can be docked with another heat source for example NIBE F1245 FL2...

Страница 15: ...water sensors These are placed in the submerged tube for hot water sensor UA1 and UA2 AHPS can also be supplemented with a solar sensor This is placed in the submerged tube for solar sensor UA3 Use th...

Страница 16: ...it is operated Filling the vessel 1 Open the externally mounted vent valve CP2 QM60 2 Fill the vessel in AHPS through the drain valve QM1 3 When the water that exits the vent valve CP2 QM60 is not mix...

Страница 17: ...line solar heating system XL14 AHPS Pressure drop kPa Flow l h 0 5 10 15 20 25 30 35 40 45 0 340 480 730 980 1480 0 mvp kPa 340 480 730 0 l h 980 10 40 20 Tryckfall Fl de 1480 30 0 1 4 2 3 0 mwk kPa...

Страница 18: ...e valve TIP The safety valve is not supplied with the accu mulator tank Contact your installer if you are unsure how one checks the valve Emptying AHP The vessel is drained via docking connection XL19...

Страница 19: ...270 80 560 600 300 300 290 440 60 55 370 55 195 245 245 1800 595 190 110 110 105 180 225 270 80 560 600 300 300 290 440 60 55 370 55 195 245 245 1800 595 190 110 110 105 180 225 270 80 560 600 300 30...

Страница 20: ...2 14 16 18 20 0 50 100 150 200 250 300 350 400 450 500 Tappfl de l m Volym varmvatten liter Varmvattenkapacitet VVM310 Ekonomi Ekonomi Normal Normal Lyx Lyx Volume hot water40 C litres Tap flow litres...

Страница 21: ...Pa bar Max pressure in boiler section 85 C Max temperature Capacity hot water heating according to EN 255 3 119 W Idle loss at Normal comfort Pes Dimensions and weight 600 mm Width 600 mm Depth 1800 m...

Страница 22: ...essure in hot water coil Stainless steel Corrosion protection hot water coil Copper Corrosion protection solar coil Capacity hot water heating according to EN 255 3 See diagram litre Tap volume 40 C a...

Страница 23: ...of the installation 4 Installation alternative 13 To ground source heat pump 14 M Maximum boiler and radiator volumes 10 P Pipe and ventilation connections System diagram 10 Pipe connections 10 Cold...

Страница 24: ......

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ...WS name Gemensamt WS version a109 working edition Publish date 2015 10 28 08 12 NIBE AB Sweden Hannabadsv gen 5 Box 14 SE 285 21 Markaryd info nibe se www nibe eu 231351...

Отзывы: