![NI Climbing Frames Trinity Towers Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/ni-climbing-frames/trinity-towers/trinity-towers_instruction-manua_1685739034.webp)
Step 17:
•
Now the tricky part. The ‘A’
-frame is designed to be at an 80° angle (i.e it is not at 90 degrees
to the surface). This is best achieved by measuring 11 ft from the end of the climbing frame
to the base of the A-frame
•
The holes on the ground should then be marked and the ‘A’
-frame should be sunk into its
place so that the swing bar is level. If your garden is level, holes about 250mm-300mm will
suffice. If your garden is running at a slope, you may need to dig the holes deeper or
shallower depending on which way the ground is falling. The aim is to level the swing bar as
well as the 3” x 1.5” support on the A frame
Содержание Trinity Towers
Страница 1: ...Trinity Towers Climbing Frame Instruction Manual ...
Страница 4: ...7 4 x 4 posts roughly 3 4m long 2 8 4 x 4 posts roughly 1m long 4 9 4 x 4 posts roughly 1 8m long 2 ...
Страница 16: ......
Страница 20: ... The posts viewed from above should now look like the image below ...
Страница 22: ... The layout of the posts from above should now look like the image below ...
Страница 25: ......
Страница 27: ......
Страница 30: ......
Страница 40: ...Step 23 Swing Attachment Hang your chosen swings from the swing hooks ...