Nextlevel Acoustics UTF 10 Скачать руководство пользователя страница 3

Step # 2

 

       After cutting the floor opening 
       (approx 4” x 12”) where desired, measure and mark 
       beam for mounting vertical brackets as shown. Ideal 
       spacing between brackets is 16” -19”. Be sure that 
       bottom of bracket plate is about ½” above bottom 
       beam edge.

Step # 3

 

       Install vertical brackets using (4) #6 drywall
       screws. Note: Vertical brackets mount to the outside
       of the beam and are directly across from one another
       allowing for a clear span on the inside. Install across
       beams 1 pc of angle iron. Push onto the threads.
       Use (1) 5/16” washer, (1) 5/16” lock washer and
       (1) 5/16” lock nut per side. Do both sides.
       Thread securely.

Step # 4

       Slide the UTF subwoofer, foam side up, into place and install second angle 
       iron as above. Tighten all 4 nuts progressively until the front side foam compresses             
       about 1/8”.

  

Step #1

       Cut the opening in the floor to fit your desired floor vent grille. 
       The floor opening must be at least as large as the size of the UTF port:

Step #2

       Port Opening Dimensions:
                   UTF 10 – 2.5” h x 11.5” l
                   UTF 12 / UTF 12 LE – 2.5” h x 12.5” l

Step #3

    • Secure the air intake plate to the floor.

Floor Vent Installation

Отзывы: