![Next MALVERN 182349 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/next/malvern-182349/malvern-182349_assembly-instruction-manual_1682410007.webp)
2
Assembly instructions
182349
MALVERN GREY STOVE
6
DON'T STOP UNTIL THE 2 O'CLOCK LOCK
TURN THE CAM IN A CLOCKWISE DIRECTION UNTIL THE
ARROW POINTS IN THE POSITIONS SHOWN IN THE
DIAGRAMS BELOW
START
CORRECT
LOCK
2
4
1
3
182349-2017-V1.
7
TURN THE CAM IN A CLOCKWISE DIRECTION
PUSH THE TWO PANELS TOGETHER ALLOWING THE
DOWEL TO ALIGN WITH THE HOLE
Содержание MALVERN 182349
Страница 2: ...30min Assembly instructions TO NO TIME 182349 MALVERN GREY STOVE 182349 2017 V1...
Страница 6: ...1 Assembly instructions 182349 MALVERN GREY STOVE 5 4 Z8 182349 2017 V1 2 1...
Страница 8: ...3 Assembly instructions 182349 MALVERN GREY STOVE 7 4 2 6 5 7 2 5 182349 2017 V1...
Страница 9: ...5 Assembly instructions 182349 MALVERN GREY STOVE 8 6 4 10 2 5 9 182349 2017 V1...
Страница 15: ...182349 MALVERN GREY STOVE 182349 2017 V1...