1. Use the template (M) provided to mark on the wall
the position of the fixings.
NB: Place the template over the back of the wall unit to
ensure that the holes match the position of the hooks
before drilling into your wall
2. Use a spirit level to check that the fixings are level .
3. Drill three holes and insert an appropriate wall plug
into each. Insert the screws and tighten,leaving the
screw head exposed by about 1/4 inch(6mm)
Warning:
Always ensure intended wall area to be drilled is
free from hidden electrical wires, water and gas
pipes.
NB: Wall fixings are not included - please source
suitable fixings for your wall type. If in doubt
please consult a qualified trades person.
STEP TEN
STEP ELEVEN
1. Lift the wall unit into position ensuring that the
fixing clips attached to the wall are firmly hooked over
the screw heads. Check the wall unit periodically to see
that no fitting has loosened and needs attention.
PLEASE SELECT WHICH ORIENTATION YOU WANT THE UNIT TO BE HANG ON THE WALL.
STEP ELEVEN
Page 5 of 6