![Newtech Castello Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/newtech/castello/castello_installation-instructions-manual_1680816006.webp)
6
CASTELLO & SIENNA BACK-TO-WALL |
PAN INSTALLATION
1.
Define the position of the connector: Place the connector onto the pan, and position
the connector between the outlet and waste pipe. Installation instructions are
supplied with each respective pan connector.
Pan
Setout
Finished
Wall
Vario
Connector
Offset Pan Collar
Fixing hole
locations
Template
Wall
2.
Mark the positions of the floor fixing kit holes.
N.B.
If floor has had waterproof
membrane applied, we
recommend just siliconing
the pan to the floor.