13
EDH0222En2010 — 10/19
GTS-V High Precision Vertical Linear Stages
8.0 —
Stage Installation
8.1
Unpacking
GTS-V stages are delivered in packaging that is designed for safe transport.
It is recommended to carefully lift and remove the stage from packaging.
Packaging can be kept and used for possible maintenance return.
8.2
Mounting Patterns
GTSV stages use M6 and M4 patterns for mounting. Base mounting pattern
can adapt M6 on a 100 mm square pattern and also 1/4-20 on 4” pattern.
Recommended screw torques are:
M6 – 7 Nm
M4 – 2.1 Nm.