![NewMar SOL 100 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/newmar/sol-100/sol-100_quick-start-manual_1679805008.webp)
P.O. Box 1306
Newport Beach
California 92663
Phone: 714-751-0488
Fax: 714-957-1621
E-Mail: [email protected]
www.newmarEVpower.com
Figure 7: Wiring
2)
Wire the battery to controller:
a)
Crimp a pair of #8 fork terminals provided to one end of a separate length of the 2/2 cable provided and
connect to the charge controller Battery screw terminals:
Red wire to Battery (+)
Black wire to Battery (–)
b)
Route this cable either directly to the battery or if more convenient, to the line side of a power distribution
bus. Before connecting to vehicle battery system install the ATC in-line fuse holder provided on the red/
positive (+) wire on the battery end (as close to + b bus as practical) – do not install the ATC-15
fuse at this time. Connect the black/negative (-) wire to the battery negative (-) terminal or a convenient
ground bus point.
Figure 8: Battery Wiring
3)
Once solar panel wiring preparation has been completed (see section 6A), install panel on roof, verify
protective cardboard is still taped to solar panel PVC side to prevent solar panel current from flowing during
wiring. Route the solar panel cable from the roof to the charge controller and crimp a pair of # 8 fork terminals
provided and connect to the charge controller ‘Solar’ panel screw terminals:
Red wire to Solar (+)
Black wire to Solar (–)
See the Morningstar Sun Savers Operators Manual for more information regarding controller operation.
8
Controller
Battery
1
1
2
2
3
3
4
4
A
A
B
B
C
C
D
D
DRAWN
Roy
CHECKED
QA
MFG
APPROVED
5/6/2011
NEW
TITLE
SOLAR80 WIRING DIAGRAM
SIZE
C
SCALE
DWG NO
REV
SHEET
1
OF
1
W
AR
+
_
+
_
+_
+
_
SOLAR PANEL
CONTROLLER
BATTERY
FUSE
Solar Panel
Fuse
Solar
+
-
+
-
+
-
Battery
-
+
15 Amp ATC Fuse
12 Volt Battery
Optional NPT-1/2
Cord Grip
12/2 Cable