background image

2.10.14 

30

 

Whipper System Maintenance-Cont’d 

Replacing Worn Components-Cont’d 

 

Pay extra attention when installing the impeller onto the whipper motor 
shaft. The impeller has an indicator arrow that must be aligned with the 
flat spot on the shaft for proper installation. If the impeller is forced 
onto the shaft without properly aligning it, it will become extremely 
difficult to remove the next time maintenance is required. 

 

 

                                                                                                       

When installing the impeller onto the shaft, make certain that it clicks into position (figure2). If 
the impeller is not pushed in far enough (figure 1), it will rub on the whipper chamber and 
eventually seize. If it is installed too far on the shaft (figure 3), it may rub on the whipper base 
and eventually seize. In both cases, the product will not mix properly and may cause a blockage in 
the powder system outlet hose. 
 
 

 

 
 
 
 
 
 
 

 

 

 

 
 
 
 
 
 

Содержание Bistro 10

Страница 1: ...Bistro 10 Operating Instruction Manual Model B 10 1 800 325 7867 3650 NEW TOWN BLVD ST CHARLES MO 63301 WWW NEWCOCOFFEE COM...

Страница 2: ...Installation Instructions 8 Set Up for Bistro 10 Unit 9 Product Installation Procedure 9 Drink Selection and Keypad Display 12 Programming Instructions 12 Programming Machine Calibration 17 Programmin...

Страница 3: ...ey are for your protection WARNING DO NOT OVERLOAD CIRCUIT ALWAYS ELECTRICALLY GROUND THE CHASSIS OR ADAPTOR PLUG DO NOT DEFORM PLUG OR CORD FOLLOW NATIONAL AND LOCAL ELECTRICAL CODES KEEP COMBUSTIBLE...

Страница 4: ...VE AND IS IN LIEU OF ANY OTHER WARRANTY WRITTEN OR ORAL EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTY OF EITHER MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE The agents de...

Страница 5: ...2 GALLON TANK 6 16 OZ CUP SIZE TEMPERATURE RANGE 180 205F CHOCOLATE LATTE INGREDIENT CABINET DRIP TRAY DRIP TRAY GRATE WATER INLET POWER SWITCH PRODUCT SELECTION SWITCH PAD DISPLAY PRODUCT DISPENSE AR...

Страница 6: ...VOLUME CONTROL PUSH HOLD HOT WATER BUTTON DUMP VALVE DELIVERY FOR POWDERS THIS IS CONFIGURED AND READY TO DISPENSE 8 OUNCE DRINKS TO CHANGE RECIPES SEE PROGRAMMING SECTION MACHINE SET UP Powder and Al...

Страница 7: ...vide an adapter fitting for connection to the brewer A dedicated water line is necessary for this machine Minimum flow rate is 1GPM 4 If installed with saddle valve the valve should have a minimum of...

Страница 8: ...probe level When tank noise is no longer heard machine is ready to operate If brew is initialized before tank temperature is reached machine will display Heating until temp is reached then will start...

Страница 9: ...k temperature is reached machine will display Heating until temp is reached then will start dispensing Place an empty cup in the dispense area open the powdered hopper door and depress the Rinse butto...

Страница 10: ...Procedure Cont d Remove the plastic insert from the BIB fitment as shown in Figure 4 Using finger and thumb only to prevent over tightening thread the BIB connector on to the BIB fitment until seated...

Страница 11: ...2 10 14 11 Product Installation Procedure Cont d Place the product in the storage compartment as shown in Figure 6 Position the tubing as shown in Figure 7 Fig 6 Fig 7...

Страница 12: ...ton until Maintenance is displayed The machine readout will display in the Message Display Area PRODUCT SELECTION BUTTON MESSAGE DISPLAY AREA SELECTION INDICATOR LIGHT PROGRAM S ACCESS AND RESET BUTTO...

Страница 13: ...Select Menu display Install Sanitizing solution Push Newco Coffee Logo to Start Sanitation Cycle See Pages 22 26 Push Hold Newco Coffee Logo to Prime Pump See Pages 22 26 Whipper Seal Remaining Remain...

Страница 14: ...Volume Factory Setting is 13 or to hear volume change Filter Size Select Filter size 0 turns Filter Tracking off If turned on filter size selections in gallons are 500 1000 1500 2000 2500 and 3000 Mes...

Страница 15: ...uccino 6oz Dbl 53 Hot Cocoa 10oz Reg 74 Mochaccino 12oz Dbl 95 Steamer 8oz 12 Coffee 12oz Bold 33 Cappuccino 6oz Tpl 54 Hot Cocoa 10oz Bold 75 Mochaccino 12oz Tpl 96 Steamer 10oz 13 Coffee 16oz Mild 3...

Страница 16: ...utton to Select Setup 2 Toggle Selection to Call for Service 0 000 000 0000 is default Character Set A A Z Character Set a a z Character Set 9 1 9 Character Set 0 1 2 3 4 5 6 7 8 9 SPACE 3 Select Call...

Страница 17: ...t button to restart cycle Left Auger Speed Chocolate this is the left or chocolate auger delivery duty cycle value 1 10 to adjust the auger motor speed for delivering powdered product This value shoul...

Страница 18: ...able of holding 32 or more ounces of water under delivery area of machine then press the top left button to start calibration countdown period of 30 seconds Note if machine is not up to temperature ma...

Страница 19: ...ay i e MILK GM OZ Adjusts the strength of the Milk portion of the drink gm oz CHOC GM OZ Adjusts the strength of the Choc portion of the drink gm oz EDIT RECIPE NAME Change the name of the drink See p...

Страница 20: ...ll and rotate Dispense Nozzle away from Whipper Bowl 5 Lift and remove Steam Cap from Whipper Bowl Pull and Remove Whipper chamber from Base 6 Wash Steam Cap Whipper Bowl and Whipper Blade in Warm Soa...

Страница 21: ...2 767195 WHIPPER MOTOR 3 767196 BASE WHIPPER MOUNTING O Ring Shaft Seal Included 4 767197 WHIPPER IMPELLER 5 767365 WHIPPER BOWL 6 767200 WHIPPER NOZZLE 7 781566 WHIPPER SEAL REPLACE AFTER 5000 CYCLES...

Страница 22: ...2 10 14 22 Cleaning Instructions 1 Remove product from storage area and disconnect BIB connectors as shown in figures 1 2 Fig 2 Fig 1...

Страница 23: ...2 10 14 23 Cleaning Instructions Cont d 2 Place an empty container in the dispense area of the machine as shown in figure 3 Fig 3...

Страница 24: ...ct the flushing solution to the BIB connector from the pump as shown in figure 4 Flush Product Type of Fittings Fig 4 400137 QCD Fitting 107117 Scholle Fitting 900044 Easy Clean Flush Solution 900044...

Страница 25: ...l pump 45 sec dwell 90 sec water 15 sec the buzzer alarm will sound 3 times if enabled during the Set Up Programming 6 When cleaning cycle ends disconnect the BIB of cleaning solution from the Pump BI...

Страница 26: ...no soapy water is being dispensed 6 Prepare 1 gallon 9 46L of sanitizing solution by dissolving 1 tablespoon of household bleach into 1 gallon 9 46L of 120 F 48 9 C water to ensure 200 ppm of availab...

Страница 27: ...or the whipper system is to remove and rinse all of the plastic parts with warm running water However a more thorough maintenance is recommended on a quarterly basis and for higher volume accounts The...

Страница 28: ...he whipper motor shaft before re installing the base The lubricant should be applied approximately on the center shaft where the seal will sit Do not apply lubricant to the complete shaft as this is n...

Страница 29: ...in the seal for the motor shaft will be oval shaped and not round This will allow liquid to get past the seal and possibly into the whipper motor After replacing the seal inspect the larger rubber O...

Страница 30: ...t properly aligning it it will become extremely difficult to remove the next time maintenance is required When installing the impeller onto the shaft make certain that it clicks into position figure2...

Страница 31: ...d Replace Service Req d Water Probe has a 30 second Hysteresis cycle Inlet Solenoid valve Faulty Replace Service Req d Control Board Failure Replace Service Req d Thermistor Error Thermistor not plugg...

Страница 32: ...2 10 14 32 Wiring Diagram...

Отзывы: