6
h
tt
p://www.NewAir.com
ELECTRICAL CIRCUIT D IAGRAM
INSTALLATION
Before connec
ting
the appliance to a power source, let it stand
upr
ig
ht for approximately 2 hours.
This will reduce the possibility
of a malfun
cti
on in the cooling system from handling during
transporta
ti
on.
Before opera
ti
ng your cooler for the
fir
st
ti
me, follow these steps:
Remove the exterior and interior packing.
Clean the interior surface of the unit with lukewarm water and a so
ft
cloth.
Place the cooler on a level surface that will be strong enough to support the
unit when it is fully loaded. To level your cooler, adjust the front feet located
at the bo
tt
om of the unit.
FAN3
FAN2
FAN1
LIGHT
SERNSOR
PLUG
TRANSFORMER
COMPRESSOR
DISPLAY PCB
CONTROL PCB
M
M
M
M
θ
θ