New World Technologies RAD-TV Скачать руководство пользователя страница 21

   RAD-TV USER MANUAL 

New World Technologies 

 

Page  •  21 

V2014.07.15 

 

Figure 6.1.2-1: Units Dropdown Menu 

6.1.3 Target Tolerance 

In the Tolerance % box, enter the tolerance from the target desired to indicate a pass or a 
fail. 

Note:

 Operation Mode 

 

Target Pass/Fail Enable

” must be s

elected for the tolerance parameter to 

be effective. Refer to Section 6.2 

 Operating Modes for more information on this option. 

6.1.4 Tool Uptime 

This is the amount of time (in minutes) before the tool goes to sleep. By default this time is 
set to 10 minutes. 

6.1.5 Bluetooth Uptime 

This is the amount of time (in minutes) before the Bluetooth turns off. By default this time is 
set to 9 minutes. 

6.1.6 Set Points 

In the Set Points box (Figure 6.1.6-1), enter the desired target that will be selectable by the 

user. To select a Target, click on the desired Target. To add a new Target, press the “

Star

” 

in the bottom left corner (Figure 6.1.6-1). To change a current Target, double click the Target 
that needs to be changed and enter the new Target

Note:

 The currently selected Target will have an arrow beside it (Figure 6.1.6-1). 

Note:

 Operation Mode 

 

Target Pass/Fail Enable

” must be selected for the 

Target parameter to be 

effective. Refer to Section 6.2 

 Operating Modes for more information on this option. 

 

Figure 6.1.6-1: Set Points Box

                               

 

6.2 Operating Modes 

Note

: The RAD-TV must be connected to the Data Logger for these operations to be enabled. Refer to 

Section 5.2 

 Connecting the RAD-TV to a PC, for more information on how to connect the tool.

 

Under  the 

Tool

  drop

down  menu  located  in  the  “

RT  Data  Logger  Software

”  select 

Setup

”, t

hen select the desired Operating Modes (Figure 6.2-1). 

Содержание RAD-TV

Страница 1: ...ating Instructions 9 4 1 Tool Assembly 9 4 2 Reaction Arm 10 4 2 1 Installing the Reaction Arm 10 4 2 2 Reaction Arm Height 10 4 2 3 Reaction Arm Foot 11 4 2 4 Reaction Points 12 4 3 Turning on the RA...

Страница 2: ...ge 2 V2014 07 15 6 1 5 Bluetooth Uptime 21 6 1 6 Set Points 21 6 2 Operating Modes 21 6 2 1 Target Pass Fail Enable 22 6 2 2 Large Font 22 6 2 3 Redo Screen 22 6 2 4 Cal Mode 22 6 2 5 Real Time Graphs...

Страница 3: ...RAD TV USER MANUAL New World Technologies Page 3 V2014 07 15 MANUAL REVISION HISTORY Revision 2014 07 15 Initial Firmware Release 3 03 98...

Страница 4: ...ls to operate correctly contact New World Technologies Inc Technical Support refer to Section 8 0 Contact Us The RAD TV Tool System should only be used if environmental storage and operation specifica...

Страница 5: ...utor immediately Lithium Polymer batteries are volatile Failure to read and follow these instructions may result in fire personal injury and or damage to property if charged or used improperly New Wor...

Страница 6: ...ftware only available upon request Figure 1 1 1 RAD TV Tool Figure 1 1 2 Reaction Arm Figure 1 1 3 Regulator Figure 1 1 4 CBT Note Some distributors may ship additional parts along with the RAD TV Too...

Страница 7: ...Po batteries are volatile Failure to read and follow these instructions may result in fire personal injury and or damage to property if charged or used improperly 2 1 General Safety Warnings and Guide...

Страница 8: ...bolts 2 3 Battery Removal and Replacement If the tool and battery guidelines are followed the battery life should exceed the normal re calibration interval of the tool As a preventative measure the b...

Страница 9: ...fasteners the safety of operation must be evaluated and appropriate precautions must be taken New World Technologies Inc will be pleased to advise you as to what those may be WARNING These tools conta...

Страница 10: ...lear of the Reaction Arm when the tool is in operation When the tool is in operation the Reaction Arm rotates in the opposite direction to the Output Square Drive and must be allowed to rest squarely...

Страница 11: ...e right side Figure 4 2 2 2 Incorrect Height IMPROPER REACTION WILL VOID WARRANTY AND CAN CAUSE PREMATURE TOOL FAILURE 4 2 3 Reaction Arm Foot Ensure the foot of the Reaction Arm aligns with the lengt...

Страница 12: ...T Reaction Arm is reacting off the middle of the Reaction Arm s foot Figure 4 2 4 1 Correct Reaction Point INCORRECT Reaction Arm is reacting off the heel of the Reaction Arm This can cause premature...

Страница 13: ...be tightened 2 Check the Forward Reverse switch is set correctly 3 Rotate the handle to a convenient position relative to the Reaction Arm 4 Fit the tool onto the bolt to be tightened with the Reactio...

Страница 14: ...ose either the New Customers or the Existing Customers download package for the Data Logger Software then a Hardware Driver download package for the drivers necessary for operations After the download...

Страница 15: ...iguration Section 6 0 RAD TV Configurations or data download Section 5 3 Downloading all Data Logs Figure 5 2 1 1 Scan All Active Transducers 5 2 2 Connecting with the USB Cable To connect through a U...

Страница 16: ...as closed To close a Data Log 1 Select the log you would like to close 2 Select Close Logs from the Tool dropdown menu or press the Close Logs button on the bottom right of the main screen Figure 5 4...

Страница 17: ...Generate Data Log Report Figure 5 6 1 Figure 5 6 1 Generate Report Button 3 The generated report will then be displayed Figure 5 6 2 Figure 5 6 2 Generated Data Log Report 4 From the generated report...

Страница 18: ...5 7 2 Export Dialog box 3 If Yes or No was selected a window will be displayed asking for a location to save the file Figure 5 7 3 Figure 5 7 3 Saving the Data Log 4 The file can now be opened to vie...

Страница 19: ...ns Prior to each deployment the user should verify the RAD TV is configured as desired Access to a PC or Laptop running the RT Data Logger software is required Configuration includes date time clock m...

Страница 20: ...Setup is selected the Tool Setup Menu will be displayed Figure 6 1 2 Figure 6 1 2 Tool Setup Menu Once all the desired changes have been made press Update 6 1 1 Date Time The date and time can be set...

Страница 21: ...nter the desired target that will be selectable by the user To select a Target click on the desired Target To add a new Target press the Star in the bottom left corner Figure 6 1 6 1 To change a curre...

Страница 22: ...ink green When the torque is failed the LED will blink red If the bolt is under torqued the LED will single blink red If the bolt is over torqued the LED will double blink red 6 2 2 Large Font Not ava...

Страница 23: ...5 1 Graph Torque Button The Torque Vs Time Graph will then be displayed on the screen Figure 6 2 5 2 Figure 6 2 5 2 Torque Vs Time Graph When a pull is done with the RAD TV a live graph will be creat...

Страница 24: ...serious or fatal injury Do not remove the battery cover or attempt to repair the device or replace the battery Do not touch any exposed power device electrical connections or cable If breakdown malfun...

Страница 25: ...t Us New World Technologies Inc 30580 Progressive Way Abbotsford BC V2T 6Z2 Canada Toll Free 1 800 983 0044 Fax 604 852 0269 Email info radtorque com Web www eradtorque com New World Technologies Inc...

Отзывы: