4. Boiler operation 

Before firing the boiler up for the first time: 
 

  Please read the entire owner’s manual; 

  Confirm that your entire hydronic heating system has enough water; 

  Confirm that the boiler is connected to the correct power source; 

  Confirm that the water pump is primed, fully operational and connected to the 

regulator; 

  Confirm that the removable fireproof bricks in the bottom chamber are properly 

positioned underneath the nozzle and in front of the bottom door. 

 

5.  Starting the fire 

When starting the fire: 

 

  Open the top (loading) door and fill the bottom layer of the loading chamber with 

easily flammable material like paper and kindling; 

  Add some dry firewood; 

  Keep the chimney flap open (or, if you prefer, closed for down draft); 

  Set fire to the paper; 

 

DO NOT LEAVE THE BOILER UNATTENDED DURING THIS STAGE!!! 

  After about 15 to 20 minutes, the firewood should be burning; 

  Carefully open the upper door (open bypass flap to prevent escape of smoke) 

and fill the entire loading chamber with fuel (make sure that the draft blower is 
operating to prevent smoke from escaping) 

  Close the upper door tightly and 

close bypass flap 

 

  Set the desired water temperature on the controller 

 

6.  Reloading fuel procedure 

  Before opening loading door, open bypass flap (crack open door and allow 

venting. Wait 10 – 15 seconds). 

  Fill up the upper loading chamber with dry firewood; 

 

Close the upper door tightly and 

shut bypass flap by pulling lever. 

 

CAUTION! 

When boiler is operating, bypass flap must be closed. 

 

7.  Maintaining and cleaning the boiler 

For the boiler to operate most efficiently, it is vital that it be cleaned frequently. This 
includes removing ash as needed, as well as cleaning the heat exchanger tubes every 
day by moving lever on side of boiler. When using fuel with higher moisture content, 
excessive creosote can build up in the burning chamber.  
 
To keep creosote formation to a minimum, burn seasoned, dry wood. When the heat 
exchanger tubes are cleaned by moving the lever (19), some fly ash will deposit at the 
bottom of the heat exchanger tubes. To remove the ash from the bottom section of the 

- 9 - 

Содержание BioMass NextGen 25

Страница 1: ...Owner s Manual Distributed exclusively in North America by New Horizon Corporation Inc 151 McGregor Drive Sutton WV 26601 304 765 7171 newhorizon gmail com www newhorizoncorp com Model 25 Model 40 Model 60 Model 80 UL CSA approved by GUARDIAN 1 ...

Страница 2: ... 2 ...

Страница 3: ...iler operation 8 Starting the fire 8 Loading fuel 8 Maintaining and cleaning the boiler 8 Additional maintenance tips 9 Boiler assembly and installation 9 Hot water storage tank 10 Recommended clearances 11 Boiler parts and features 12 Open system setup 14 Electrical setup for Model 40 15 Electrical setup for Model 60 16 Manufactured for New Horizon Inc by HAMECH POLAND 17 200 HAJNÓWKA ul Armii Kr...

Страница 4: ...boilers should be installed by a certified plumber or plumbing and heating contractor or technician New Horizon Inc does not take any responsibility for incorrect installation or improper boiler usage BioMass boilers are generally used for heating homes and small commercial buildings The water temperature inside the boiler cannot exceed 200 F The display on the boiler s controller will show the cu...

Страница 5: ...he boiler into the heating system by using multiple water pass trough water jacket and counter flow of flue gas The insulation jacket made out of compressed mineral wool minimizes heat loss from the boiler allowing for the maximum amount of heat transfer from the boiler into the heating system 3 How the boiler works During the gasification process wood inside the loading burning chamber is dried a...

Страница 6: ...om thermostat advance setting 4 Enable oil boiler when wood burner is operating or disable oil boiler when wood burns out In case of excessive water temperature creeping over 195 F overheating should be prevented by a safety thermostat aqua stat which should activate so called damp zone in garage or in basement to relieve excess heat Controller is also able to automatically shut down operation of ...

Страница 7: ...rn Water Pipe C in 32 32 6 32 4 36 5 Height of Water Drain Valve D in 2 7 2 7 2 7 2 75 Height of Flue Pipe E in 46 5 46 5 46 5 49 5 Width with Clean up Lever F in 25 31 5 31 5 31 5 Depth H in 39 39 54 5 59 0 Distance of Hot Water Outlet I in 9 5 9 5 9 5 14 0 Flue Pipe Size J in 6 6 6 8 Hot Water Outlet Pipe Size G in 2 2 2 2 Water Return Pipe Size G in 2 2 2 2 Drain Pipe Size G 3 4 3 4 3 4 Boiler ...

Страница 8: ...h of the wires used is sufficient Confirm that the electrical outlet and the controller have the same voltage 110 V When these precautions have been taken plug the regulator into the electrical outlet 110V and then turn on the power switch The regulator will automatically reset itself and display the current boiler temperature The regulator should not be exposed to extreme sunlight or heat If dust...

Страница 9: ... smoke and fill the entire loading chamber with fuel make sure that the draft blower is operating to prevent smoke from escaping Close the upper door tightly and close bypass flap Set the desired water temperature on the controller 6 Reloading fuel procedure Before opening loading door open bypass flap crack open door and allow venting Wait 10 15 seconds Fill up the upper loading chamber with dry ...

Страница 10: ...boiler at the end of the heating season thoroughly clean both chambers It is a good idea to burn some wood from time to time to keep boiler dry inside to increase the longevity of the unit 8 Additional maintenance tips During the heating season regularly check water pressure in your heating system leaks in your heating system heat exchanger seal door seals 9 Boiler assembly and installation BioMas...

Страница 11: ...er storage tank with the BioMass boiler is highly recommended but not necessary Depending on the size of the space being heated the storage tank should be between 500 and 1 000 gallons Storage tanks Decrease fuel consumption Increase the lifespan of the boiler by decreasing idle time during the outside temperature changes Make the entire heating system more efficient and easier to operate Decrease...

Страница 12: ...Recommended clearances for BM 25 40 60 80 in mm Note Neither New Horizon Corp nor the manufacturer is responsible for inappropriate boiler installation or operation 12 ...

Страница 13: ...Boiler parts and features See page 13 for details 13 ...

Страница 14: ...fractory Nozzle 12 Door Handle 13 Secondary Burning Chamber ash pit 14 Lower Door 15 Flue Connection 6 16 Clean up Access Cover 17 Clean up Access 18 Chimney Bypass Flap 19 Heat Exchanger Clean up Lever 20 Overheat Thermostat 21 Hot Water Outlet 22 Lower Clean up Access Cover 23 Lower Clean up Access Cover 24 Boiler Water Return 25 Tubular Heat Exchanger 26 Secondary Air Injection 27 Flue Flow Dir...

Страница 15: ...Open system setup example 15 ...

Страница 16: ...Electrical setup for BioMass 40 16 ...

Страница 17: ...Electrical setup for BioMass 60 and 80 17 ...

Страница 18: ...inally purchased Shipping charges in connection with replacement or repair shall be paid by the owner Warranty Year of Coverage 1 5 100 6 60 7 50 8 40 9 30 10 20 20 21 0 Example 1 Repair costing 250 in year 7 Importer will pay 125 00 50 of this repair OTHER COMPONENTS LIMITED THREE YEAR WARRANTY This limited warranty covers only repairs or replacements resulting from defects in materials and workm...

Страница 19: ...must be performed by your dealer or someone authorized by him You may be required to present this limited warranty to the dealer before any work is performed You must pay for any work performed which is not covered by this limited warranty or which is not authorized by the dealer Disposal and recycling of boiler components EKO boilers contain steel electronic components insulation and other materi...

Отзывы: