
6 - MAINTENANCE
Maintenance planning
Maintenance chart
Lubricate
Check
Maintenance action
Page no.
Every 10 hours
Grease fittings - Lubricate
x
6-8
As necessary
Hardware - Check
x
6-9
Hydraulic hoses - Check
x
6-10
Every 10 hours
Grease fittings - Lubricate
Grease Fittings
1. Wipe dirt from fittings before greasing.
2. Use a grease gun containing clean high grade of
M
ULTI
-P
URPOSE
G
REASE
E
XTREME
P
RESSURE AND ANTI
-
WEAR
NLGI 2
.
3. Pump fresh grease into the fitting to lubricate the component and force out any contamination from the
grease passage.
4. Wipe off excess grease.
5. Make sure that all the moving parts and grease fittings on the backhoe are lubricated as well as the control
levers for the control valve.
6. Lubricate the following grease fittings
(1)
through
(17)
with
M
ULTI
-P
URPOSE
G
REASE
E
XTREME
P
RESSURE
AND ANTI
-
WEAR
NLGI 2
every 10 operating hours.
NOTE: (7) (8) (9) (10)
have grease fittings on the right-hand side as well.
6-8
Содержание 905GBL
Страница 4: ......
Страница 34: ...3 CONTROLS AND INSTRUMENTS 3 4 ...
Страница 42: ...4 TRANSPORT OPERATIONS 4 8 ...
Страница 58: ...5 WORKING OPERATIONS 5 16 ...
Страница 70: ...6 MAINTENANCE 6 12 ...
Страница 74: ...7 TROUBLESHOOTING 7 4 ...
Страница 83: ......