New England Arbors The Kensington Planter Box & Trellis Скачать руководство пользователя страница 2

2

Fit the front wall panel over the side walls. Push until the panels

 

bottom out. Using the 1 1/2” 

(38 mm) 

screws provided

,

 secure the 

side wall

 

panels into the front wall panel with 2 screws at the end of 

the rails.

 

Screws should only be drilled in 

half-way

 so that panels do 

no pull

 

out of the posts when under stress.

3

4

5

STEP ONE

Slide the floor panels together and place inside the planter bo

x

Install the four post cap to the four posts as shown. 

Connect the Front & Back Wall 

to the Side Wall Panels

1

2

5

1

2

3

4

STEP T WO

Install the Floor Boards and

Post Caps

Layout front wall panel on the work surface. 

Insert the side walls into the routed holes on the front wall

 

panel 

posts. Push until The panel bottoms out. Fasten each panel

 

with two 

2 1/2

"

 

(64 mm) 

screws on the side of the trellis post as shown.

www.newenglandarbors.com

www.newenglandarbors.co

.uk

North America Toll Free Phone: 

1 800 282 9346

 

United Kingdom 

Tel: (44) 2038 687160 

Отзывы: