background image

4

4

STEP FOUR

Arbor Installation

Move the ar

b

or to its final location (

y

ou will need a helper).

 

W

hen 

y

ou are satisfied with the location

,

 mark the locations of

 

the posts

,

 

then move the ar

b

or aside and la

y

 it carefu

lly

 on its side.

 

E

x

cavate 4 

holes appro

x

.

 10

” 

(25 cm) 

deep. Caref

ully

 move the ar

b

or

 ba

ck

 

into 

position and level it 

b

oth vertical

ly

 and horizontall

y

.

Backfill the holes with the e

x

cavated soil to cover the anchors.

1

A  

 Into Earth (temporary Installation)

2

Similar to the a

b

ove steps

,

 move the ar

b

or to its final location.

 

W

hen 

y

ou are satisfied with the location

,

 mark the locations of 

the posts

,

 then move the ar

b

or aside and la

y

 it carefu

lly

 on its side.

 

E

x

cavate 4 holes appro

x

. 18” 

(46 cm) 

deep

,

 6“ 

(15 cm) 

diameter.

 

F

ill the holes with wet cement flush to the ground. 

Y

ou will need

2 bag

s of pr

e-

m

ix 

concrete (purchase separatel

y

). Caref

ully

 move

the ar

b

or

 b

ack into position.

Support the ar

b

or and level over the holes with

 b

ricks

,

 stones or

b

locks of wood under the 

b

ottom rail of the side panel. The

 

post 

b

ottoms should insert themselves appro

x

imatel

y 1

 (2.5 cm) i

nto

 

the concrete. Allow the concrete to set.

1

2

3

B  

 Into Earth With Concrete Footing

A

1

1

0

6

2

Level

Level

Slide the four ground 

mounting extension 

into the 

b

ottom of

 

each posts until it 

b

ottoms out and secure with two 5/8” 

(16 

mm)

 

screws

,

 

one on the inner side and one on the outer side of

the posts

 

as shown.

1

     Arbors must be well secured to prevent tipping over from wind load, 
etc.  We have provided four ground

 mounting extensions 

 for 

securing the arbor in

 

a temporary application like a wedding, etc.  

These 

extensions 

 are not designed to permanently mount your 

arbor. If you are installing your

 

arbor on concrete or a wood deck, visit 

your hardware store to

 

 purchase the appropriate galvanized 

bracketing hardware.

 Ground 

M

ounting Extensions 

Installations

1

B

18

" (46 cm)

6

"

(15 cm) 

1

www.newenglandarbors.com

www.newenglandarbors.co

.uk

North America Toll Free Phone: 

1 800 282 9346

United Kingdom 

Tel: (44) 2038 687160 

Содержание London

Страница 1: ... Read Instructions through carefully before beginning assembly When assembling components place on a non abrasive surface i e shipping box to avoid scratching We recommend an area approx 10 ft x 8 ft 3mx2 4m for unobstructed assembling You should not need to use excessive force when assembling components Please read through before starting assembly IMPORTANT CHECK THE INSIDE OF YOUR POSTS FOR ALL ...

Страница 2: ...BENT into place slightly longer than middle vertical spindle Slide the Side Panel Middle Horizontal Rail over the three vertical spindles to about the middle of the vertical spindles Position the Side Panel Top Horizontal Rail and insert the Middle Vertical Spindle Tension bend into place the two outer vertical spindles The assembled side panel will need to be held together until it is inserted in...

Страница 3: ...t caps on top of posts Connect Arch System to Side Panels 6 7 8 9 Layout one LEFT post as identified horizontally with holes facing up and insert the assembled side panel by aligning the horizontal rails with the holes on the post Layout one RIGHT post as identified horizontally with holes facing up and insert the assembled side panel and post into Fasten the side panel to the posts by using 1 1 4...

Страница 4: ... arbor and level over the holes with bricks stones or blocks of wood under the bottom rail of the side panel The post bottoms should insert themselves approximately 1 2 5 cm into the concrete Allow the concrete to set 1 2 3 B Into Earth With Concrete Footing A 1 10 6 2 Level Level Slide the four ground mounting extension into the bottom of each posts until it bottoms out and secure with two 5 8 16...

Отзывы: