New England Arbors Dublin Скачать руководство пользователя страница 2

STEP ONE

2

Slide post caps into position as illustrated.   Push firml

until arches  

b

ottom out inside the post caps.  

 

Join arches together as illustrated.  

 

F

asten four 5/8 in. (16 

m

m.) screws in each post cap at top 

of   arches as illustrated (

F

ig. 1)

,

 and repeat for other arch.  

F

asten 

two screws 5/8 in. (16 

m

m.) in top portion of post caps at 

b

ottom of

 

arch (Fig. 2), and repeat for other arch.

  

Insert arch rafters (6) into the holes on the arches until the

y

  

b

ottom out inside the arches.  There are “locking ta

b

s” located at  

each end of the rafters that once inserted into the holes will lock  

into place. 

The Dublin Arbor

 / Arch

Assemble the Arch System

3

3

4

1

1

F

ig. 2

2

F

ig. 1

2

PLEASE NOTE: 

Arch rafters have  locking tabs located at both ends.  Once 

inserted and pushed  into the routered holes they will lock 

 into place permanently.

4

www.newenglandarbors.com

Содержание Dublin

Страница 1: ...tion Read Instructions through carefully before beginning assembly When assembling components place on a non abrasive surface i e shipping box to avoid scratching We recommend an area approx 10 ft x 8 ft 3 m x 2 4 m for unobstructed assembling You should not need to use excessive force when assembling components Please read through before starting assembly IMPORTANT CHECK THE INSIDE OF YOUR POSTS ...

Страница 2: ...ost caps at bottom of arch Fig 2 and repeat for other arch Insert arch rafters 6 into the holes on the arches until they bottom out inside the arches There are locking tabs located at each end of the rafters that once inserted into the holes will lock into place The Dublin Arbor Arch Assemble the Arch System 3 3 4 1 1 Fig 2 2 Fig 1 2 PLEASE NOTE Arch rafters have locking tabs located at both ends ...

Страница 3: ...to place the two outer vertical spindles The assembled side panel will need to be held together until it is inserted into the post Lay out one LEFT post as identified horizontally with holes facing up and insert the assembled side panel by aligning the horizontal rails with the holes on the post Lay out one RIGHT post as identified horizontally with holes facing up and insert the assembled side pa...

Страница 4: ...the holes with wet cement flush to the ground You will need 2 bags of pre mix concrete purchase separately Carefully move the arbor back into position Support the arbor and level over the holes with bricks stones or blocks of wood under the bottom rail of the side panel The post bottoms should insert themselves approximately 1 1 5cm into the concrete Allow the concrete to set 1 2 3 B Into Earth Wi...

Отзывы: