manualshive.com logo in svg
background image

A

SSEMBLY

  

I

NSTRUCTIONS

NOTE:MUST TIGHTEN SCREW PERIODICALLY.WITH USE SCREWS WILL
BECOME LOOSE CHECK THIGHT OF ALL SREWS EVERY 6-8 WEEKS.

MADE IN MALAYSIA

STEP 2

COMPLETED

ASSEMBLY

STEP 3

1

2

3

Important !!

LEVEL THE SIDE RAIL BY

COVERING WITH A SOFT CLOTH

AND TAPPING WITH A HAMMER.

Press laterally into
the groove and
drop down.

7

6

4

Affix the  Bottom
Rail Support (6) to
Wooden Slat (7) as
Shown.

Affix  the Side Rail (5) to
the Wooden Slat (7) using
the CSK screw (E) and a
screwdriver.

E

5

5

7

5

2

B677W-315  ANDOVER 5/ 0 Q HEADBOARD, FOOTBOARD & SLATS-WHITE
B677W-335  ANDOVER 5/ 0-6 /6 Q/EK SIDE RAILS-WHITE

B677B-315  ANDOVER 5/ 0 Q HEADBOARD, FOOTBOARD & SLATS-NUTMEG
B677B-335  ANDOVER 5/ 0-6 /6 Q/EK SIDE RAILS-NUTMEG

&

PAGE 2 OF 2

B677W-415  ANDOVER 4/6 F HEADBOARD, FOOTBOARD & SLATS-WHITE
B677W-535  ANDOVER 3/ 3-4 /6 T/F SIDE RAILS-WHITE

B677B-415  ANDOVER 4/6 F HEADBOARD, FOOTBOARD & SLATS-NUTMEG
B677B-535  ANDOVER 3/ 3-4 /6 T/F SIDE RAILS-NUTMEG

1

4

3

5

1

4

3

2

7

6

Отзывы: