manualshive.com logo in svg
background image

NOTE:MUST TIGHTEN SCREW PERIODICALLY.WITH USE SCREWS WILL
BECOME LOOSE CHECK THIGHT OF ALL SREWS EVERY 6-8 WEEKS.

MADE IN MALAYSIA

STEP 1

COMPLETED

ASSEMBLY

3

L

4

R

A+B+C

1

Thank you for purchasing this quality product.  Be sure to check all packing materials carefully for small parts, which
may have come loose inside the carton during shipment.  Identify and count all items and compare with the parts list
and/or hardware list shown below.

A+B+C

A+B+C
A+B+C

BACK VIEW

A+B+C

D

4x

Screw Driver is not included

PARTS LIST

ITEM DRAWING DESCRIPTION QTY

1

HEAD

BOARD

1 PC

2

FOOT

BOARD

SLATS

SUPPORT

7

WOODEN

SLAT

SIDE RAILS

A

C.S.K SCREW
(M4) 4 x32mm

HARDWARD LIST

ITEM DRAWING DESCRIPTION QTY

HB LEG

POST (L)

3

5
6

1 PC

2 PCS

4 PCS

4 PCS

8 PCS

HB LEG

POST (R)

1 PC

1 PC

4

B

4 PCS

C

Spring Washer

M8 x22mm

4 PCS

D

Flat Washer

M8 x 16 x 1.6mm

4 PCS

E

1 PC

JCBB (M8)

8 x 35MM (NYLOK)

ALLEN KEY M5

5 x 35 x120MM

PAGE 1 OF 2

A

SSEMBLY

  

I

NSTRUCTIONS

B677W-315  ANDOVER 5/ 0 Q HEADBOARD, FOOTBOARD & SLATS-WHITE
B677W-335  ANDOVER 5/ 0-6 /6 Q/EK SIDE RAILS-WHITE

B677B-315  ANDOVER 5/ 0 Q HEADBOARD, FOOTBOARD & SLATS-NUTMEG
B677B-335  ANDOVER 5/ 0-6 /6 Q/EK SIDE RAILS-NUTMEG

&

B677W-415  ANDOVER 4/6 F HEADBOARD, FOOTBOARD & SLATS-WHITE
B677W-535  ANDOVER 3/ 3-4 /6 T/F SIDE RAILS-WHITE

B677B-415  ANDOVER 4/6 F HEADBOARD, FOOTBOARD & SLATS-NUTMEG
B677B-535  ANDOVER 3/ 3-4 /6 T/F SIDE RAILS-NUTMEG

Step 1: Attach and tighten the leg

posts (3 & 4) to the head board (1)
by inserting JCBB bolt (A) with

washers (B & C).

Отзывы: