background image

NOTE: 

Chase Installation: (See Figure 3.)  A chase is an enclosure built specifically to house a chimney. The 

interior of a chase is open from the ZC20 to the roof, eliminating the need to cut through ceilings and the roof. 
Normally, a chase is built outside and against the exterior wall of a home. A hole is cut through the wall, and the 
ZC20 is located in the bottom of the chase, with the front of the unit flush with the interior wall. Chases are 
commonly veneered on the outside with brick, stone or wood to give the appearance of a conventional fireplace 
flue. Occasionally, they are built inside and boxed in, similar to a  stairwell. When making a chase installation, it is 
important to read the chimney manufacturer’s instructions prior to building, as there are specific requirements for 
bracing a free-standing flue and must be planned for. There are also occasions where offsets are used within a 
chase to accommodate unusual building designs, or to locate the ZC20 further into a room. 
 

FRAMING CONSTRUCTION AND INSTALLATION

 

 
Except as noted, the ZC20 can be installed almost anywhere you desire. There are, however, a few clearance and 
framing restrictions that must be followed. See Figure 3 and 4 to make sure that these clearance restrictions are 
met. It is much wiser to place your ZC20 correctly at the start of the installation than to be forced to relocate it after 
much of the work is done. 
 
You must ensure that the floor is of adequate strength to accept the load of this unit. If inadequate, the floor will 
require additional support, such as bracing. 

NOTE:

 A wooden base constructed of plywood or 2”x4” boards is 

required in order to get proper clearance above the extended hearth (millboard, rock, stone, etc.). 
 
Good planning is essential for a satisfactory installation, therefore, at this point you should have decided where the 
ZC20 is to be located and the route the chimney will follow to the roof—straight up, or chase. If you cannot decide 
the best route, contact your Dealer for assistance with the planning. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Above (Figure 4) are framing location examples with depth dimensions for some typical configurations. These are 
finished measurements so install accordingly. 
 
Position ZC20 for installation as follows: 
1.  Thoroughly clean the area where the unit will be placed. Remove any carpeting/padding from the area where 

the ZC20 will be installed. 

2.  Lay out the location on the floor for ZC cabinet. (See Figure 4) 
3.  Layout for hearth extension preparation and removal of carpet and padding. 
4.  A sheet metal safety shield is placed 1 1/2” under the cabinet. It must extend out under the floor protector. 
5.  Now, you are ready to install the chimney system for the ZC20. If you are building an outside chase, follow 

approved Chimney Manufacturer’s instructions. If you are penetrating a ceiling, install the chimney as 
follows: 
a.  Drop a plumb line, locate, and mark point on ceiling directly over center of ZC20 chimney adapter 
b.  After locating the center of the hole, install the firestop spacer per chimney manufacturer’s instructions. 

 

FIGURE 4

 

25” 

25” 

25” 

INTERIOR LOCATION 

ADJACENT ROOM 
OF EXTERIOR CHASE 

CO

RN

ER

   

   

   

LO

CA

TI

ON

 

Содержание 20 Room Heater

Страница 1: ...er is not properly installed a house fire may result For your safety follow the installation directions Contact local building or fire officials about restrictions and installation inspection requirements in your area This product is listed by Warnock Hersey International Inc to the UL Standard No 1482 and 127 Manufactured by New Buck Corporation Spruce Pine NC 28777 Revised May 2001 PN PI 200660 ...

Страница 2: ... SECTION IV Mobile Home Installation 19 Parts Requirements 19 Minimum Clearances 20 Tools for Installation 20 Installation Preparation 21 Determining the Chimney Location 22 Final Check 23 SECTION V Zero Clearance Installation 24 Minimum Clearances 26 SECTION VI Safety 28 SECTION VII Operation 29 Building a Fire 29 Operating and Safety Hints 31 Guide to Burning Qualities of Wood 31 Helpful Hints 3...

Страница 3: ......

Страница 4: ...re set the switch to the Off position and the blower well not run at any temperature Set the switch to the Auto position and when the stove temperature reaches 110o blower will automatically come on 3 Primary Air Control The primary air intake draft control is located on the upper portion of the unit next to the top extension It is operated by moving up and down to control the amount of primary ai...

Страница 5: ...ds DO NOT BURN 1 Treated Wood 3 Garbage 5 Solvents 7 Trash 2 Coal 4 Cardboard 6 Colored Paper Burning treated wood garbage solvents colored paper or trash may result in release of toxic fumes and may poison or render the catalytic combustor ineffective Burning coal cardboard or loose paper can produce soot or large flakes of char or fly ash that can coat the combustor causing smoke spillage into t...

Страница 6: ...observe the emissions leaving the chimney Step 3 Engage the bypass mechanism and again observe the emissions leaving the chimney Significantly more smoke should be seen when the exhaust is not routed through the combustor bypass mode Be careful not to confuse smoke with steam from wet wood CAUTION AGAINST OVER FIRING Do Not Over fire This Heater Attempts to achieve heat output rates that exceed he...

Страница 7: ...o the flue liner subject to State and Local codes in your area 2 An equivalent sized flue liner is installed when the flue liner size is larger than the heater flue gas exit Connection must be from stove exhaust outlet extending the full height of the chimney and must include a rain cap 3 Location of chimney is interior not on an outside wall Satisfactory results have been reported with installati...

Страница 8: ...s the K factor s is calculated as follows Formula Required thickness K of alternate material K of millboard x thickness of millboard Example An alternate inorganic non combustible millboard with a K of 9375 would require a thickness as follows Required thickness 9375 5 0 x 2 in 3 8 inch K Factors of Alternate Materials Material K Required Thickness Ceroform 126 21 1 8 Limestone 8 0 3 2 Concrete 8 ...

Страница 9: ... or marring the surface 3 Remove the existing fireplace damper plate 4 Thoroughly clean the fireplace of ashes and soot 5 Check the chimney and smoke chamber for excessive buildup of creosote or soot Also check for obstructions such as bird s nests If the chimney is excessively dirty clean it or have someone clean it professionally BEFORE installing or using the room heater 6 If the fireplace has ...

Страница 10: ...l BEHIND the side cold air vent on top of the unit In other words it is possible to have the heater too far in as well as not far enough 3 Center the heater in the fireplace opening MOUNTING THE TRIM PANELS After the unit is positioned as shown in Figure 2 mark the mounting position of the trim panels as follows 1 Set the top long trim panel in place on top of the unit The panel should be flat aga...

Страница 11: ...underneath the front lip of the mounting bracket already secured to top of unit NOTE Mount the top trim panel so that it sits in front of the top of the side trim panels 9 Obtain the brass trim kit provided with unit and slip over the top and sides of trim panels Top ends of brass may need to be trimmed to fit 10 If direct connect or positive connect kit is not used follow instructions in steps 1 ...

Страница 12: ...ginal draft can be preheated by lighting newspaper and holding it near the open damper with a poker or fire tong Once the chimney heats up a proper draft can usually be obtained If a thorough review of the Troubleshooting Guide in the rear of the manual does not reveal the problem contact your dealer for assistance NOTE The unit is painted with a specially formulated high temperature paint that cu...

Страница 13: ...ble wall pipe close clearance also cause a substantial drop in flue gas temperature If a double wall pipe connector is being contemplated check with the pipe manufacturer to ascertain that the use of their product will not affect the flue gas temperature Do not use double wall pipes which reduce flue gas temperatures Satisfactory results have been reported with installations other than listed abov...

Страница 14: ...s to be installed on a combustible floor a non combustible pad must be placed below it to protect the floor from burning material from the stove The pad must be 36 wide by 37 deep UL tests were conducted without a floor protector Therefore the protector can be of any thickness and any K factor The unit must be positioned on the pad so that there is a minimum of 16 from the front of the door openin...

Страница 15: ...he primary air draft control to ensure that it operates freely 4 Check the operation of the bypass damper control to ensure that it will open and close properly 5 Remove any items from within the firebox Spread the drop cloth on the floor behind the heater Next tilt the heater so that the back is on the drop cloth 6 Using a tape measure make a line down 3 from the front of the heater 7 Open the co...

Страница 16: ... bob from the ceiling above the unit so that the weight is hanging in the center of the flue exit A small weight on a string will serve as a plumb bob Mark the ceiling where the string is suspended to locate the center of the chimney 2 After locating the center of the hole install the ceiling support box chimney or chimney connector flashing and rain cap per the chimney manufacturer s instructions...

Страница 17: ...IZED PIPE Connect each section so the crimped end faces downward and secure each section to each other using at least three 3 steel sheet metal screws or rivets 6 After securing New Buck Corporation Chimney Connector to heater secure pipe to connector with three 3 screws or rivets C Wall Exit Into Masonry Using Single Wall Pipe Before connecting the Model 20 to a masonry chimney determine that the...

Страница 18: ... the chimney b Connect each section so the crimped end faces downward c Secure each section to each other using at least three 3 sheet metal screws or rivets d After securing New Buck Corporation Chimney Connector to heater secure pipe to connector with three 3 screws or rivets D Ceiling Exit Close Clearance Using Listed Close Clearance Pipe and 2100o HT Chimney System From Approved Manufacturers ...

Страница 19: ...with a marginal draft can be preheated by lighting newspaper and holding it near the open damper with a poker or fire tong Once the chimney heats up a proper draft can usually be obtained If a thorough review of the Troubleshooting Guide in the rear of the manual does not reveal the problem contact your dealer for assistance NOTE The unit is painted with a specially formulated high temperature pai...

Страница 20: ...odel 20 Room Heater Outside air pedestal kit P21B 6 Chimney Connector MA 6CHIMCNB UL Listed and factory approved Chimney Systems Simpson Dura Vent Simpson Dura Vent Security Security Selkirk Metal Bestos Selkirk Metal Bestos Metal Fab Metal Fab 6 Double wall chimney connector type DVL 6 2100o HT Type DP Chimney 6 Type DL Double wall connector 6 Security type ASHT high temp chimney 6 Model DS Doubl...

Страница 21: ...ust be 36 wide by 37 deep for the Model 20 Tests were conducted without a floor protector Therefore the protector can be of any thickness and any K factor The unit must be positioned on the pad so that there is a minimum of 16 from the front of the door opening to the front of the pad and a minimum of 8 measured horizontally from the sides of the fuel loading and ash removal openings to the sides ...

Страница 22: ...e pad 5 Next remove the four 4 screws holding the heater to the stand Position heater out of the way of the installation area 6 Check that the pedestal stand is still aligned with the marks and now mark the inside outside air opening of the stand on the pad 7 Next mark the center line of the outside air opening Set stand aside for now 8 Next cut a 4 1 4 diameter hole 2 1 8 radius from centerline i...

Страница 23: ...oper air spacing required 3 Add additional pipe until both of the following are met a Chimney pipe is 3 higher than roof at the point where it penetrates the roof See Figure 4 b Chimney pipe height is at least 2 higher than any part of the roof within 10 of the chimney See Figure 5 4 Next install a New Buck Corporation Chimney Connector to the flue of the heater See Figure 4 5 Using Type DVL doubl...

Страница 24: ...eats up a proper draft can usually be obtained If a thorough review of the Troubleshooting Guide in the rear of the manual does not reveal the problem contact your dealer for assistance NOTE The unit is painted with a specially formulated high temperature paint that cures during the first two or three firings You may notice a slight smoking effect and an odor of burning paint when you build the fi...

Страница 25: ...le for installation of the Model 20 unit into them However factory approval from New Buck Corporation and Warnock Hersey Laboratories is required prior to installation Installation must conform to New Buck Corporation installation instructions or addendums INSTALLATION Pre Fab Fireplace Insert MINIMUM CLEARANCES INSTALLATION PREPARATION Pre Fab Fireplace 1 Locate furniture and other materials away...

Страница 26: ... listed and tested methods of installation of the Model 20 heater into the specified Pre Fab Models A 6 Increaser 1 The preferred method is to use an increaser made of 24 ga minimum stainless steel to go from 6 inside diameter to the exact diameter of the fireplace throat chimney See Figure 2 2 Position the increaser into the throat chimney of the Pre Fab Cabinet at a height slightly higher than t...

Страница 27: ...he stove to the Pre Fab fireplace CAUTION Although this method is a tested and approved method some codes may not allow this type installation so be sure to check local codes for approval prior to making this type of installation FIGURE 2 FIGURE 3 INCREASER PACK TIGHT WITH CERAMIC WOOL DO NOT USE GLASS WOOL 6 FLEX PIPE OR ADJUSTABLE ELBOW ...

Страница 28: ...to the flue exit of the heater approximately 3 8 Check that the damper operates without hitting the connector Now seal the connector to the heater and fireplace throat if method 1 is used using refractory cement CAUTION Do not loosen the ceramic blanket 5 CAUTION Crimped end of connector must be placed into the heater throat 6 Check installation minimum clearances and install an approved heater ex...

Страница 29: ...tively cool chimney flue of a slow burning fire As a result creosote residue accumulates on the flue lining When ignited this creosote makes an extremely hot fire The connector and or chimney should be inspected at least once a month during the heating season to determine if a creosote buildup has occurred If creosote has accumulated it should be removed to reduce the risk of a chimney fire 6 Loca...

Страница 30: ...load the heater with wood MODEL 20 OPERATION A Low Burn Rate Set primary air control to the low setting Set the Auto Off Manual switch to the Auto position Wood Loading During refueling open pull out the bypass damper to allow smoke in the firebox to escape open the door and add wood Immediately close door and bypass damper Reopen the door 1 4 for one 1 minute to charge wood Close and latch door A...

Страница 31: ...close door and bypass damper NOTE To select primary air setting center rod where it exits the air vent opening and align to the marked settings on the heater You will have to experiment with the rate until you find the particular setting for heating your home Chimney drafts tightness of the house doors and windows and atmospheric conditions all influence which setting you must have so it may take ...

Страница 32: ...e allows for a quicker prolonged burn and more complete combustion SPLIT WOOD vs ROUND WOOD Split wood burns easier and more rapidly whether it s seasoned or green If used after starting a fire it should be packed tightly to achieve a longer burn Round wood burns longer but requires more effort to start Inserting a round piece over a bed of red coals with the damper and drafts open will help it ca...

Страница 33: ...fire while retaining the efficiency of your heater Although the brand of glass used in the heater door has well established and recognized heat resistant and strength characteristics it can be broken through improper care To achieve the maximum utility and safety of your glass door we advise that you observe the following use and safety tips 1 Inspect the glass regularly for cracks or breaks If yo...

Страница 34: ...ts for plugging crumbling and other physical degradation 1 If a problem exists refer to the Troubleshooting section of the manual for possible cause of the problem and solution including replacement if necessary 2 Reassemble if the catalysts are okay being sure the stainless steel heat reflector is positioned back in its original position and bolt housing and heat reflector securely back in place ...

Страница 35: ...on of gaskets 1 Obtain the proper gaskets and silicone glue from your local dealer 2 Using pliers remove any worn and deteriorated gaskets 3 Using a scraper wire brush and sandpaper or steel wool clean glue and gasket residue from the door frame 4 Measure and cut gaskets to length Care should be taken not to stretch the gaskets What you want is a full and loose gasket weave after attachment to the...

Страница 36: ...or Manual position push in on the bottom of the switch This will allow your Room Air Blower to operate without the thermostat being activated With the switch placed in this position the Room Air Blower will continue to operate until it is Manually shut Off WIRING SCHEMATIC Changes refer to page 34 in your owners manual Due to the Auto Off Manual switch replacing the Rheostat NOTE When ordering rep...

Страница 37: ...mption 4 Backpuffing 5 Smoke Rollout When Heater Door Is Opened 6 Low Catalytic Temperature 7 Creosote Running From Draft Inlet Openings Chimney Related Problems 1 Creosote Accumulation 2 Tar and Liquid Creosote Leaking from Metal Flue Joints 3 Heavy Concentration of Smoke Leaving Chimney 4 Rusted or Corroded Flue Parts 5 Odor 6 Poor Drafting Chimney Combustor Related Problems 1 Plugging 2 Catalys...

Страница 38: ...high temperatures Used in furnaces kilns and stoves Used to mean only hard or dense firebrick as distinguished from soft or insulating firebrick FIRING RATE Rate at which fuel is burned in a heater FLAME IMPINGEMENT Flames directly contacting the combustor face FLUE COLLAR The part of a stove to which the chimney connector or chimney attaches GLOW PLUG EFFECT When a combustor is at temperatures ab...

Страница 39: ... the low fire mode In such a case the combustor resistance would offset the remaining draft resulting in a system that will not draft Creosote Build up Even though reduction of creosote is one of the primary advantages of a combustor equipped device some creosote forming gases will escape unburned during normal operation In the event the combustor ceases to function creosote can be expected to acc...

Страница 40: ... RELATED PROBLEMS Problem 1 Sluggish heater performance 2 Drop in Overall Efficiency Solution 1 Check for and remove obstruction 2 Check trim kit gasketing seal to fireplace and gasket as nec essary to seal unit Gasket under stove if needed Check seal of direct connect and correct 3 Open manual damper and wire shut with stainless steel wire or remove damper 4 Follow New Buck instructions for prope...

Страница 41: ... Close inlet air control as much as possible to maintain desired heat output Check gaskets reinstall fiberglass gasketing around door and glass as necessary 3 Burn seasoned wood that is dry and of good quality 4 Weather stripping caulking insulation storm windows 5 Replace warped stove parts 6 If warped or broken replace 7 Put combustor in operating position or close bypass in stove 8 See Combusto...

Страница 42: ...ems 1 Burn dry seasoned wood 2 Burn reasonably sized loads so the combustor has a chance to burn the wood gases that are produced 3 Keep a good bed of coals in the heater 1 Replace any damaged parts 2 Try not to burn pitchy wood Don t overstuff the firebox burn pieces of wood with an approximate diameter of 6 or larger 3 Replace single walled metal chimneys with double walled insulated chimney sec...

Страница 43: ...s or direct connect kit not sealed 1 Improper chimney height 2 Wrong flue size being used Ex using a 10 flue on an 8 flue collar 3 Cooler temperatures caused by external chimney 4 Massive stone or masonry chimney Solution 1 Water vapor is normal and should be of little concern 2 Burn dry seasoned wood 3 See section on Combustor Related Problems 4 Replace warped bypass Close bypass 1 Replace worn o...

Страница 44: ...content Wood seasoned outside uncovered may have 40 moisture content Wood properly seasoned in a covered environment will have less than 20 moisture content 3 FT 2 FT LESS THAN 10 INCHES 2 FT 10 FT GREATER THAN 10 FT 3 FT METAL CHIMNEY MASONRY CHIMNEY 2 FT MINIMUM HEIGHT ABOVE THE ROOF WITHIN 10 FT HORIZONTALLY CHIMNEY 10 FT RULE MINIMUM HEIGHTS ...

Страница 45: ...ses a sulfur based compound to coat the catalyst 1 Normal operation as long as combustor remains intact Solution 1 Do not burn materials such as garbage gift wrap or cardboard 2 Burn dry seasoned wood Don t place the combustor in the operating position until temperatures are high enough to initiate light off It may be possible to burn the accumulated soot or creosote off by putting the combustor i...

Страница 46: ... in color from combustor to combustor or within a combustor can occur new combustors Solution 1 Handle with care 1 Combustor being contin ually overfired Reduce burn rate 2 Do not exceed 06 of water draft Install a manual damper and draft gauge or a barometric damper with free standing units 1 These color variations are normal and do not affect combustor performance ...

Страница 47: ...ay result For your safety follow the installation directions Contact local building or fire officials about restrictions and installation inspection requirements in your area WARNING THIS IS NOT A FIREPLACE Do not attempt to build a fire in this product It has been designed and safety tested for use only with Model 20 manufactured by New Buck Corporation Read and follow the installation and operat...

Страница 48: ... these parts be installed only in accordance with these instructions The Zero Clearance cabinet and the Model 20 hereafter referred to as the ZC20 is designed for installation in a family dwelling where minimum clearance is desired INSTALLATION PRECAUTIONS The following precautions are mandatory for a safe installation A Compliance with local building codes and regulations is mandatory B Be carefu...

Страница 49: ...ither outside or inside These are normally used as follows FIGURE 1 THROUGH CEILING FIGURE 2 THROUGH CATHEDRAL CEILING FIGURE 3 OFFSET TO CLEAR OBSTRUCTION CAUTION Refer to chimney manufacturers instructions for assembly and disassembly of chimney parts Be sure to follow chimney instructions for proper clearances to combustibles and proper air spacing required STORM COLLAR FLASHING CHIMNEY PIPE ME...

Страница 50: ...t the load of this unit If inadequate the floor will require additional support such as bracing NOTE A wooden base constructed of plywood or 2 x4 boards is required in order to get proper clearance above the extended hearth millboard rock stone etc Good planning is essential for a satisfactory installation therefore at this point you should have decided where the ZC20 is to be located and the rout...

Страница 51: ... instructions for attic and roof penetration e Once the roof penetration is made install the flashing f Add applicable lengths of chimney extending through the roof until the following conditions are met 1 Chimney height is at least 12 to 15 maximum 2 The chimney must extend a minimum of 3 above the highest point where it penetrates the roof 3 The chimney must extend a minimum of 2 higher than any...

Страница 52: ...m framing to chimney 2 minimum See Figure 6 ZC20 Model 20 FIGURE 6 CHASE ENCLOSURE AND CORNER LOCATION FRAMING Optional Fire Code Sheet Rock And Metal Fire Stop Ceiling NOTE Follow building and fire codes for each individual state 2 In Min NBC Radiation Shied 15FT MAX CHASE ENCLOSE URE TOPPER STORM COLLAR ROOF FLASHING TRIPLE WALL PIPE 2 X 4 STUDDING USE FIRE CODE SHEET ROCK NBC METAL FIRE STOP RA...

Страница 53: ...ws Required thickness 9375 0o x 2 inch 3 8 inch K Factors of Alternate Materials Material K Required Thickness Ceroform 126 21 1 8 Limestone 8 0 3 2 Concrete 8 0 3 2 Sandstone 13 0 5 2 Marble 18 0 7 2 Hearth extension or floor protector thickness above four 4 inches is generally not acceptable due to cost floor load capacity and look The alternate we recommend is using Ceroform No 126 millboard 1 ...

Страница 54: ...ck any openings designed into the unit 11 Install a mantel above the unit if desired Note that a combustible mantel must be positioned at least 12 above the top of the ZC20 cabinet FIGURE 7 POWER HOOK UP TOP FRONT TRIM PANEL BRASS TRIM RIGHT SIDE TRIM PANEL BLACK WHITE GROUND REAR COVER PLATE RECEPTACLE BOX HEATER POWER CORD ...

Страница 55: ... utmost importance that these parts be installed only in accordance with these instructions The Zero Clearance cabinet and the Model 20 hereafter referred to as the ZC20 is designed for installation in a family dwelling where minimum clearance is desired INSTALLATION PRECAUTIONS The following precautions are mandatory for a safe installation A Compliance with local building codes and regulations i...

Страница 56: ...r to get proper clearance above the extended hearth millboard rock stone etc Where cabinet is to be placed a 4 1 4 diameter hole with a 2 1 8 radius from center line must be cut through floor Outside air duct kit PP 70075 01 is be installed See Figure 9 1 Thoroughly clean the area where the unit will be placed Remove any carpeting padding from the area where the ZC20 will be installed 2 Layout the...

Страница 57: ...chimney but not to exceed 15 above the hearth d Install the flashing storm collar and chimney cap as indicated in the manufacturer s installation instructions 6 The ZC20 Cabinet is now ready for framing as follows a Frame the ZC20 using 2 x4 studs or local building code framing Some minor framing restrictions are required 1 Adjacent side walls must be at least 17 from the outer edge of the ZC20 tr...

Страница 58: ...ate inorganic non combustible millboard with a K of 9375 would require a thickness as follows Required thickness 9375 0o x 2 inch 3 8 inch FIGURE 10 CHASE ENCLOSURE AND CORNER LOCATION FRAMING Optional Fire Code Sheet Rock And Metal Fire Stop Ceiling NOTE Follow building and fire codes for each indi vidual state NBC RADIATION SHIELD 15FT MAX 2 In Min Chase Enclosure TOPPER STORM COLLAR ROOF FLASHI...

Страница 59: ...trician must wire the ZC20 into the home wiring system using No 15 AWG with ground wiring as minimum in accordance with local wiring codes CAUTION Stove is plugged into cabinet receptacle A Remove brass trim B Remove top panel and right side panel C Now an electrician must do the wiring 9 Now finish the wall around the ZC20 using brick rock sheetrock paneling or any type finishing material CAUTION...

Страница 60: ...hot fire The connector and or chimney should be inspected at least once every two months during the heating season to determine if a creosote buildup has occurred If creosote has accumulated it should be removed to reduce the risk of a chimney fire 5 Locate furniture and any other combustibles away from the stove 6 Store firewood at a safe distance from the stove 7 Disposal of Ashes Ashes should b...

Страница 61: ...at least once every two months during the heating season to determine if creosote or soot has built up Check spark arrestor screens every 2 4 weeks If creosote or soot has accumulated it should be removed to reduce the risk of chimney fire 3 How to Clean Have your chimney cleaned by a professional chimney sweep if you have doubts about your ability to clean it using a plastic wood or steel brush D...

Страница 62: ...entative who will instruct you on the proper procedure depending on which Warranty Time Period Period I or Period II applies If for any reason you are dissatisfied with the sug gested procedures you may contact us in writing at NEW BUCK CORPORATION Customer Service Department P O Box 69 Spruce Pine NC 28777 CONDITIONS AND EXCLUSIONS A Replacement of parts may be in the form of new or fully recondi...