CriticalConneX™ User Guide - CC2100
Page 2
Introduction
This user guide shows you how to install the CC2100 into your Multi-mode Fiber or
Copper Gigabit network.
Inspect Package
Remove the TAP and accessories from the shipping box. Make sure you received these
items:
1 x CC2100: 1x4 Gigabit Multi-mode Fiber or Copper Gigabit CriticalTAP™ with 4
Copper Gigabit Monitoring Ports
2 x Power Cords
1 x Console Cable: DB9M to DB9F, 10' Straight Through Cable
Note:
If any items are missing or damaged in shipping please inform us immediately.
Operational Status
Indicators
Multi-mode Gigabit
Fiber LAN Ports (LC)
Port Status Indicators
Yellow = 1000 mbps
Link/Activity
Gigabit Copper
LAN Ports
Programmable
Monitor Ports
Front Panel
Rear Panel
Console Port
Power Inlets