Installation
10
1. Apply the primer thinly and evenly to the
container wall
and
the NKK.
2. Allow the treated areas to evaporate for at
least 5 minutes until the primer has dried.
NKK with bolts (upper surface)
NKK with bolts (lbottom surface)
NKK for PKL (upper surface)
1. Stick the supplied glue strips all around
on the bottom surface of the NKK so that
the ends of the glue strips almost touch
each other.
The glue strips ensure that the required dis-
tance (3 mm) between the NKK and the con-
tainer wall is maintained.
NKK with glue strips (bottom surface)
NKK for PKL with glue strips (bottom
surface)
Applying
primer
Attaching glue
strips