![Netkrom AIRNET AIR-PTP5000L Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/netkrom/airnet-air-ptp5000l/airnet-air-ptp5000l_quick-installation-manual_1674320005.webp)
AIRNET Outdoor Bridge
Point to Point
Installation
Step 1:
Connect one end of your UTP or FTP
Outdoor cat.5 Ethernet cable with
waterproof connector to the RJ-45
connector located in the AIRNET Outdoor
Bridge unit. Then connect the other end of
the cable to the PoE injector.
For the Netkrom PoE, the recommended
length of the Category 5 cable is up to 260
feet or 80 meters.
1.-
Remove the thin enclosure nut
from the feedthru assembly. This
can be discarded. Loosen the
compression nut completely
2.-
Insert the RJ45 connector thru
the feedthru assembly
3.-
Tighten the compression nut
loosely to the feedthru assembly
enclosure nut
feedthru assembly
compression nut