5. With the blue latch on the right, slide the replacement power supply into the chassis.
Both power supplies must be the same model and wattage.
Ensure that the blue latch is on the right side when you slide the replacement unit in.
6. Push the cam handle down to secure the replacement power supply.
7. If you are replacing both power supplies, repeat steps 2 though 6 to replace the second power supply.
8.
Connect the power cords to the replaced units and apply power
.
9. If you placed the appliance in maintenance mode, exit maintenance mode. From the StorageGRID
Appliance Installer, select
Advanced
>
Reboot Controller
, and then select
Reboot into StorageGRID
.
Remove SG6000-CN controller from cabinet or rack
Remove the SG6000-CN controller from a cabinet or rack to access the top cover or to
move the controller to a different location.
What you’ll need
• You have labels to identify each cable that is connected to the SG6000-CN controller.
• You have physically located the SG6000-CN controller where you are performing maintenance in the data
center.
Locate controller in data center
• You have shut down the SG6000-CN controller.
Shut down SG6000-CN controller
Do not shut down the controller using the power switch.
Steps
1. Label and then disconnect the controller power cables.
2. Wrap the strap end of the ESD wristband around your wrist, and secure the clip end to a metal ground to
prevent static discharge.