Steps 3 and 4 apply only if you are installing H410C and H410S nodes in a NetApp H-series chassis.

1

Install the rails.

2

3

4

Install the chassis.

See

 

Rail Kit Installation instructions

.

Note:

 

• Ensure that you have installed the rack according to the safety instructions from the manufacturer.
• Ensure that the rack is stabilized. The heaviest equipment should be at the bottom of the rack. 
• Follow proper grounding practices to avoid risk of electric shock. 
• Follow proper airflow and cooling requirements to prevent hardware from overheating.
• Installing the chassis requires two people.

Install hardware 

|

 Stage 

2

The minimum initial NetApp HCI configuration requires two chassis.

Steps 1 and 2 apply only if you are setting up a new system.

Install nodes in the chassis.

Install drives for storage nodes.

LNK

ACT

PORT   1

PORT   2

LNK

ACT

PORT   1

PORT   2

LNK

ACT

PORT   1

PORT   2

LNK

ACT

PORT   1

PORT   2

CHASSIS BACK VIEW

Node A

Node B

Node C

Node D

Node B

Node C

Node D

Node A

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

SS

D

-E

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

1

.9

T

B

CHASSIS FRONT VIEW

LIFTING HAZARD

CAUTION

77.1 lb (35 kg)

H610C

H410C, H615C, 

and H410S

LIFTING HAZARD

CAUTION

40.5 lb (18.4 kg)

H610S

LIFTING HAZARD

CAUTION

Approximately

70 lb (31.75 kg)

The installation graphic 

is only for illustrative 

purposes. Your actual 

node might differ based 

on what you ordered.

Содержание HCI Series

Страница 1: ...ser H610C compute node order dependent H610S storage node order dependent H615C compute node order dependent End User License Agreement Hardware Universe HWU NetApp HCI Documentation Center NetApp HCI Resources page NetApp SolidFire Resources page SolidFire and Element 11 3 Documentation Center Slide rail kit NetApp HCI chassis only for H410S and H410C HCI UID UID UID UID NODE D NODE D NODE C NODE...

Страница 2: ... if you are setting up a new system Install nodes in the chassis Install drives for storage nodes LNK ACT PORT 1 PORT 2 LNK ACT PORT 1 PORT 2 LNK ACT PORT 1 PORT 2 LNK ACT PORT 1 PORT 2 CHASSIS BACK VIEW Node A Node B Node C Node D Node B Node C Node D Node A SSD E SSD E SSD E SSD E SSD E SSD E SSD E SSD E SSD E SSD E SSD E SSD E SSD E SSD E SSD E SSD E SSD E SSD E SSD E SSD E SSD E SSD E SSD E SS...

Страница 3: ...virtual machines and storage connectivity Optional recommended Connect a CAT5e cable in the IPMI port for out of band management connectivity 10 25GbE cables Two cable configuration OPTION A Port D Port E IPMI Connect two CAT5e or higher cables in ports A and B for management connectivity Connect two SFP28 SFP cables or transceivers in ports C and F for virtual machine connectivity Connect two SFP...

Страница 4: ...the front of the chassis Note It takes approximately five minutes and 30 seconds for the node to boot 10 25GbE cables H610C compute node Power cables 1 10GbE cables Note H615C nodes are deployed only in the two cable configuration Ensure that all the VLANs are present on ports A and B Connect the node to a 10 25GbE network using two SFP28 SFP cables in ports A and B Optional recommended Connect th...

Страница 5: ...for management H610S storage node 3 Connect the power cords to the two power supply units per chassis and plug them into 240V PDU or power outlet This step does not apply if you are adding a new node to an existing chassis Steps 3 and 4 apply only if you are installing H410C and H410S nodes in a chassis Cable the storage node If the airflow vents at the rear of the chassis are blocked by cables or...

Страница 6: ...x Google Chrome or Microsoft Edge navigate to the NetApp Deployment Engine by connecting to the IPv4 address that you configured in Step 1 3 Use the NetApp Deployment Engine user interface UI to configure NetApp HCI Note If you are expanding your installation using H615C compute nodes you must ensure that the cluster runs on NetApp HCI 1 7 or later 1 Using a supported web browser browse to the IP ...

Страница 7: ...d calvin 3 From the node management screen navigate to Settings Network Settings and configure the network parameters for the out of band management port See How to access BMC and change IP address on H610S H615C compute node If your H615C node has GPUs in it install the GPU driver See the NetApp Deployment Guide Configure out of band management using the Baseboard Management Controller BMC 1 Use ...

Отзывы: