T E C H L I N E A S ™ D E S I G N G U I D E
NETAFIM @[email protected]
21/12/2009
38
TECHLINE AS™ SYSTEM INSPECTION CHECK LIST:
Project Name:
…………………………………………………………………
Date:
…………………
Dripper Spacing
0.3m
0.4m
0.5m
Dripperline Spacing
0.3m
0.4m
0.5m
Other
m
Dripper Flow Rate
1.6 LPH
3.0 LPH
Application Rate
mm/hr
Installation Type
Under Mulch
Sub-surface
Depth Below Grade
mm
Station
Program
Run Time
Flow Rate
End Line Press
Number
Number
(Minutes)
(L/M)
(KPA)