background image

220-0000073 rev01

UIM-E3

E3 Uplink Interface Module

Installation

1. Unpack and inspect the equipment.

The following components should be included:

          1 UIM-E3
          4 #6 Phillips Panhead Internal Locking Screws
          2 #6 Phillips Beige Flathead Screws

If there is any visible damage, do not attempt to connect the device. Contact Customer Support at 1-
877-638-2638 (001-603-427-0600 for international customers) or [email protected].

2. Verify switch configuration.

Ensure that the DIP switches on the UIM-E3 circuit board are positioned correctly (according to 
desired configurations) prior to installing the UIM-E3 on a Multiplexer Uplink Module or in a Mini 
DSLAM. There are two DIP switches located on the top side of the circuit board, opposite the 
faceplate. Switches are numbered from left to right; Switch #1 (on the left) is not used, Switch #2 
(on the right) is configured as follows:

Transmit Line Buildout 
Switch Configuration

 

Installation Instructions

 

CAUTION

Net to Net Technologies strongly recommends the use of proper electrostatic discharge (ESD) precautions when 
handling this equipment. 

Switch #1 Switch #2 Tx Line Buildout

not used

down

0-255 ft.

not used

up

255-450 ft.

  