Net Led Lighting NET-44-10-68 Скачать руководство пользователя страница 2

Installation procedure: 

Carefully read the installation instructions and ensure the mains supply is isolated before installation. Please follow the safety information overleaf before carrying out any installation. Please retain 

this leaflet for future reference. 

LED IP20 EM Twin Spot Installation:

Step 1:

 

Isolate the mains supply and remove the front cover by inserting a flat screwdriver in the side of the 

fitting. 

Step 2:

 

Preapre the product for mounting and attach to a solid surface using screws (not supplied). If the 

product is to be used in damp or wet locations, adequate care must be taken to ensure the IP rating is 

maintained. Leave sufficient space around the product to allow access for maintenance and heat dissipation.  

Step 3:

 

Connect the permanent live neutral and earth per the diagram below. Connect the battery using the 

plug to the main board. Ensure all connections are correct and tight.

Step 4:

 

Switch on the power source and ensure the charge LED is lit. Close the cover and fail the power 

source after a few minutes to check for correct dis-charge operation. Leave the product on charge for an 
initial 24 hours to allow the battery to charge completely.  

Monthly Test

1                  Functional

2                  Functional

3                  Functional

4                  Functional

5                  Functional

6                  One Hour

7                  Functional

8                  Functional 

9                  Functional

10                Functional

11                Functional

12                Three Hour

Year 1

Sign

Date

Emergency Test Record: 

1

 Connect the battery 

2

 Switch on the Main Supply - Check the charge LED illuminates   

3

 Switch off the Main Supply 

4

 Check the charge LED extinguishes and luminaire functions in emergency mode

Year 2

Sign

Date

Year 3

Sign

Date

Year 4

Sign

Date

Year 5

Sign

Date

Отзывы: