background image

START, ATTACHING 2 LONG CAP (E) TO 2 HEAD BOARD (A) (B) WITH 8

DOWERS (2),12 SHAFT (5) AND 12 CAM (6).BY USING PHILLIPS HEAD

SCREW DRIVER.

STEP-1

STEP-2

STEP-3

STEP-4

START THE BOTTOM BUNK BY ATTACHING SIDE RAIL ( G) (H),AND SLAT

HOLDER (Q) TO HEADBOARD (A) (B) WITH 8 HEXAGON SCREW (1), 

8 DOWEL (2) BY USING ALLEN KEY (11).

THEN ATTACH 2 LEG SUPPORT (R) TO SLAT HOLDER (Q) WITH 2 HEXAGON 

SCREW (3) .

ATTACH2 SLAT (U) AND 12 SLAT M) TO BOTTOM BED WITH 28 SCREWS (7).

BY USING PHILLIPS HEAD SCREW DRIVER.

START, ATTACHING2 SHORT CAP (F) TO 2 HEAD BOARD (C) (D) WITH 6

DOWERS (2). 8 SHAFT (5) AND 8 CAM (6) BY USING PHILLIPS HEAD SCREW 

DRIVER.

5

1

5

2

5

E

F

E

A

J

L

B

A

A

L

J

C

J

H

18

17

7

8

5

5

1

2

E

E

F

6

3

4

6

6

20

G

G

20

Отзывы: