Before leaving the installation site, complete the following items in the checklist.
Record the E-CODER)R450
i
ID for each register.
Verify that you have followed all requirements of this Installation and Maintenance Guide.
Verify that you have recorded all required information.
Clean up any installation debris.
Verify that you have completed all requirements of the Site Work Order.
Inform the customer that you have completed your work. If you were unable to finish,
inform the customer when you will be back to complete the project.
Table 7 – Installation Checklist
E-CODER
®
)R450
i™
Installation and Maintenance Guide
15
Chapter
5:
Activating
and
Testing
the
E-CODER
®
)R450
i
™
Содержание E-CODER) R450i
Страница 1: ...E CODER R450i Installation and Maintenance Guide...
Страница 2: ......
Страница 3: ...E CODER R450i Installation and Maintenance Guide...
Страница 10: ...This page intentionally left blank ix E CODER R450i Installation and Maintenance Guide Figures...
Страница 12: ...This page intentionally left blank xi E CODER R450i Installation and Maintenance Guide Tables...
Страница 39: ......