![Neptune 13458-000 Скачать руководство пользователя страница 109](http://html1.mh-extra.com/html/neptune/13458-000/13458-000_installation-and-maintenance-manual_1668232109.webp)
Self-Diagnostics (Self-Test)
If the push button is held for four seconds, the ProStar goes into
automatic self-diagnostics. The button must be released to start
the self-test. See Table 22
The push button can be used to toggle through the displays
faster. The entire self-test takes 30 to 45 seconds. The load is
turned on for 0.1 seconds and can flash during the test. A
short or overload condition could cause a controller restart.
Display
Battery Status
8.8.8
Self-test started, checking the digital meter segments
12u
System voltage (12/24/48)
15A
ProStar current rating
r1.5
Software version installed
E04
Fault detected (see Table: 12 on page 1 for fault error list)
---
Display if no fault is found
25c
Temperature measured at the controller remote
rP
Temperature probe is detected (if connected)
25c
Temperature at the remote probe (if connected)
SEn
Battery sense detected (if connected)
S-2
Battery selected position (1, 2, or 3)
Example: Position '2" is the desired position for AGM batteries
J-1
Telecom noise jumper cut (change to on-off regulation)
END
End of self-test
END---END
Display; continues if no error was detected
END END
Display; continues if an error has been detected
Table 22 – Self-Test Display Examples
R900 Gateway Installation and Maintenance Guide
91
Appendix A Solar Power Information
Содержание 13458-000
Страница 2: ......
Страница 3: ...R900 Gateway v4 Installation and Maintenance Guide...
Страница 6: ...This page intentionally left blank...
Страница 26: ...This page intentionally left blank Chapter 1 Overview 8 R900 Gateway Installation and Maintenance Guide...
Страница 116: ...This page intentionally left blank Appendix A Solar Power Information 98 R900 Gateway Installation and Maintenance Guide...
Страница 149: ......