
7. Thread the cable around the strain relief posts of the encoder.
See Figure 10.
Figure 10 – Cable Threaded Around Strain Relief Posts
8. Apply sealant liberally and ensure that it encapsulates the
terminal screws and exposed wires. See Figure 11.
Neptune requires Novaguard G661 sealant or Dow Corning
compound 4.
Figure 11 – Application of the Sealant
Any leak point can cause a reading failure in a submerged
meter setting.
L900 MIU Pit and Wall Installation and Maintenance Guide
13
Chapter 3: General Installation Guidelines
Содержание L900 MIU Pit
Страница 2: ......
Страница 3: ...L900 MIU Pit and Wall Installation and Maintenance Guide...
Страница 10: ...This page intentionally left blank viii L900 MIU Pit and Wall Installation and Maintenance Guide Contents...
Страница 14: ...This page intentionally left blank xii L900 MIU Pit and Wall Installation and Maintenance Guide Tables...